Similar Projects
Tamarac Lakes Sections 1 and 2 Water Main Improvements Project
Infrastructure
Bidding
$2,000,000 est. value
Oakland Park, Tamarac, FL 33309

Coral Hills Water Main Replacement (Phase 1)
Infrastructure
Bidding
$1,500,000 est. value
Coral Springs, FL

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Fire Hydrants and Accessories
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Valve Maintenance and Assessment Program
Term Contract
Results
Less than $45,000 est. value
Cooper City, FL 33329

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Water Meter Reading and Related Services
Term Contract
Bidding
Fort Lauderdale, FL

Provide an On-Site Calibration and Verification of 26 Abb Flow Meters
Term Contract
Post-Bid
Less than $10,995 est. value
Hollywood, FL

Backflow Prevention and Plumbing Services
Term Contract
Results
Less than $200,000 est. value
Fort Lauderdale, FL

Leak Detection Services
Infrastructure
Bidding
Miramar, FL

Water System Interconnect Upgrades
Post-Bid
Pompano Beach, FL

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

BCJC Jail Water Meter Reconfiguration
Post-Bid
Fort Lauderdale, FL 33301

12 Inch Water Main Installation Foster Road
Results
Less than $1,496,057 est. value
Hallandale, FL 33009

Last Updated 10/29/2021 09:54 AM
Project Title

Water Meter Installation Project

Physical Address View project details and contacts
City, State (County) Pembroke Pines, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of aging residential water meters, 20-years old or older, throughout the City. The replacement will be by route, totaling approximately 16,272 of Owner-Supplied water meters. Furnish all labor, materials, equipment and incidentals required to install, complete, and ready for operation, Owner Furnished domestic water meters, backflow prevention devices, water meter boxes. The water meters to be replaced are located on various meter-reading routes throughout the City. Please follow the below link to see the location of the subject routes. The total number of meters, routes. The number of meters and backflow prevention devices to be replaced, the number of meter boxes to be replaced adjusted, etc

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents