Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

DFCM Construction - DWR Logan Fes Groundwater Wells Assessment
Bidding
$180,000 est. value
Logan, UT 84321

Ledges 1 and Tolman 4 Water Well Cathodic Protection System
Post-Bid
Saint George, UT

Mexican Hat SSD Well Improvements
Post-Bid
Mexican Hat, UT

Water System Drilling, Construction and Testing
Results
Heber, UT

F--New Westwater Well
Results
$100,000 to $250,000 est. value
Cisco, UT

South Well Chlorinator Upgrade 2020
Bidding
Grantsville, UT

Construction of the Coldwater Well Improvement Project
Post-Bid
Mendon, UT 84325

Milford Culinary Well Drilling Project 2019
Results
Less than $549,205 est. value
Milford, UT 84751

Drilling Rig and Services for Forge
Bidding
Milford, UT

Ras Pump System
Post-Bid
Provo, UT 84601

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Last Updated 06/16/2020 04:56 AM
Project Title

DFCM Construction - UVU Central 1 Plant Well House Upgrade

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $666,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall includes the removal and replacement of heat exchangers in Central Plant #1. The Central Plant #1 Well Pump & Piping of the 175’ Well Pump including the Motor. The new discharge pump head will tie into the existing piping. Two 12” (Cla-Val) valves shall be refurbished/ rebuilt. The existing heat exchangers shall be replaced with new double wall heat exchangers. Valves, specialties, controls, etc, associated with the heat exchangers shall be replaced.. The base bid shall include all work and materials associated with the project as outlined in the plans and specs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents