Similar Projects
White Mountain Apache Tribe Water Settlement - U0164 - City Of Avondale
Alteration
Conception
$2,800,000 est. value
Whiteriver, AZ 85941

Construct Runway 2/20 (60' x 4,712') - City of Show Low
Infrastructure
Conception
$5,000,000 CJ est. value
Show Low, AZ 85901

Jr's Shop Addition
Addition, Demolition, Renovation, Infrastructure - 1,400 SF
Design
$280,000 CJ est. value
Joseph City, AZ 86032

Pre-Settling Pond Upgrades for the White Mountain Apache Tribe
Infrastructure
Design
$275,150 CJ est. value
Whiteriver, AZ 85941

Proposal 1 - Refurbishing and Recoating a Riveted Steel Storage Tank North Side
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Holbrook, AZ 86025

Refurbishing and Recoating a Welded Steel Storage Tank South Side
Infrastructure
Bidding
$190,000 CJ est. value
Holbrook, AZ 86025

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Fort Defiance N112 Road Improvements 3.06-Miles
Infrastructure
Post-Bid
AZ

System Enhancement (Safety Improvements)
Infrastructure
Results

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Hashknife Solar Energy Center
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Holbrook, AZ 86025

Frontier Park Playgound and Splash Pad - City of Show Low
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Show Low, AZ 85901

Construct Two Large Helicopter Parking Pads - City of Show Low
Infrastructure
Conception
$600,000 CJ est. value
Show Low, AZ 85901

N566 and N361, San Juan Chapter, Double Chip Seal
Infrastructure
Post-Bid
AZ

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Results
Prescott, AZ 86301

Last Updated 02/16/2023 02:13 AM
Project Title

Crack Seal Runway 7-25 - City of Show Low

Physical Address View project details and contacts
City, State (County) Show Low, AZ 85901   (Navajo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the City of Show Low 2024-2028 Capital Improvement Plan (CIP). As of February 16, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents