Similar Projects
Last Updated | 02/26/2020 01:10 PM |
Project Title | 2020 Asphalt Overlay Project |
Physical Address | View project details and contacts |
City, State (County) | Castle Rock, CO 80104 (Douglas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $10,002,306 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of placement of 1,000 tons of hot mix asphalt patching and 92,106 tons of hot mix asphalt overlays at various locations throughout Douglas County. The project also includes placement of between 12,282 tons and 18,423 tons of hot mix asphalt overlay using one of three methods (conventional rotomill and overlay, hot in-place recycling and repaving, or surface recycling combined with overlay) on Flintwood Road and Singing Hills Road in Douglas County. The Project includes the following major items: 1. Removal of Asphalt Mat 2. Reset/Adjustment of Manholes/Water Valve boxes 3. Removal/Replacement of pavement markings 4. Unclassified Excavation 5. Aggregate Base Course |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |