Similar Projects
Castle Pines Parkway Reconstruction Project Monarch Boulevard to Yorkshire Drive
Bidding
Castle Pines, CO 80108

Providence Village Rec Center Landscape and Site Civil Improvements
New Construction
Post-Bid
Highlands Ranch, CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Townwide Resurfacing Program
Results
$300,000 to $400,000 est. value
Parker, CO

Plum Creek Parkway Roadway Widening and Roundabout Improvements Phase 1B
Results
Less than $6,878,487 est. value
Castle Rock, CO

Statewide Asphalt
Post-Bid

2020 Slurry Seal Project
Results
Less than $1,742,825 est. value
Castle Rock, CO 80109

Crooked Stick Traffic Signal and Widening Project - Phase 1
Post-Bid
Lone Tree, CO 80124

2020 Meadows Boulevard and Prairie Hawk Drive Reconstruction Project
Results
Less than $3,152,271 est. value
Castle Rock, CO 80109

2020 Median Rehabilitation
Post-Bid
Lone Tree, CO

2020 Crack Seal and Mastic Project
Results
$160,943 est. value
Castle Rock, CO 80109

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

2020 Townwide Diamond Grind and Joint Seal Program
Results
$500,000 to $600,000 est. value
Parker, CO 80138

Woodmoor Mountain Road Projects
Post-Bid
CO

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

Last Updated 02/26/2020 01:10 PM
Project Title

2020 Asphalt Overlay Project

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80104   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $10,002,306
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of placement of 1,000 tons of hot mix asphalt patching and 92,106 tons of hot mix asphalt overlays at various locations throughout Douglas County. The project also includes placement of between 12,282 tons and 18,423 tons of hot mix asphalt overlay using one of three methods (conventional rotomill and overlay, hot in-place recycling and repaving, or surface recycling combined with overlay) on Flintwood Road and Singing Hills Road in Douglas County. The Project includes the following major items: 1. Removal of Asphalt Mat 2. Reset/Adjustment of Manholes/Water Valve boxes 3. Removal/Replacement of pavement markings 4. Unclassified Excavation 5. Aggregate Base Course

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents