Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,000,000 est. value
Tacoma, WA 98417

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Conception
$677,000 est. value
Sunnyside, WA 98944

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

Design-Build Barrier Weir and Fish Ladder Modifications / Tsoo Yess River Barrier and Fish Passage Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Clallam Bay, WA 98326

SR 96, North Creek Fish Passage
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Mill Creek, WA 98082

SR 96, North Creek Fish Passage
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Mill Creek, WA 98082

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Post-Bid
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

2021-2022 Master Planning: Beaton Hill Park And Big Rock Park South
New Construction, Infrastructure
Results
$275,000 est. value
Sammamish, WA 98074

I-5/SB over I-705 and RR - Special Repairs
Infrastructure
Conception
Tacoma, WA 98418

Rainforest Trailhead Comfort Station Replacement
New Construction, Demolition, Infrastructure
Design
$250,000 to $500,000 est. value
Quinault, WA

SR 10 et al, Kittitas and Yakima Co and SE WA Centerline Rumble Strip
Infrastructure
Bidding
$1,250,000 to $1,500,000 est. value
Cle Elum, WA

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Rotary Morrow Park - Phase 1
Renovation, Infrastructure, Alteration
Results
$96,406 est. value
Poulsbo, WA 98370

Last Updated 06/23/2022 01:18 AM
Project Title

Deer Harbor Road MP 1.10 Slump

Physical Address View project details and contacts
City, State (County) Eastsound, WA 98245   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the realignment of approximately 600 feet of Deer Harbor Road on Orcas Island, San Juan County, WA. Work includes clearing and grubbing with significant tree and stump removal; roadway excavation and disposal; placement and compaction of gravel roadway base; installation of storm drainage culverts; and other work, Estimated Cost: $250,000 Time for Completion: 30 working days The County is not holding a pre-bid conference for this project. The project site is open to bidders for inspection. Any Addenda to the Contract Provisions and Plans will be posted online. Only Bidders who have notified Public Works that they are interested in supplying a quote will be notified by the Public Works Department of Addenda. Notification will be made using the contact information provided by the bidder. In accordance with Standard Specification 1-02.4(1): Oral explanations, interpretations, or instructions given by anyone before the Award of a Contract will not be binding on San Juan County. Any information given a prospective Bidder concerning any of the Bid Documents will be furnished to all prospective Bidders as an Addendum if that information is deemed by San Juan County to be necessary in submitting Bids or if San Juan County concludes that the lack of the information would be prejudicial to other prospective Bidders. Bid Guarantee: Bid deposit shall be submitted with each bid by check or money order, in the amount of 5% of the bid amount, or a bid bond in lieu of deposit. Informational Items Contract Requirements: The successful bidder must meet all the mandatory bidder responsibility criteria set forth in RCW 39.04.350 and will be required to carry and maintain a minimum of $1 million in liability insurance coverage throughout the period of the contract, in accordance with County policy. State Taxes: This contract is subject to WAC 458-20-171 (Rule 171) for tax purposes, and the bidder shall include for compensation the amount of any taxes to be paid in the various unit bid prices or other contract amounts (1-07.2(1) APWA GSP June 27, 2011). Contract Bond (Payment and Performance Bond): The successful bidder shall provide an executed contract bond for the full contract amount, in accordance with RCW 39.08.010. Withholding of Retainage: Pursuant to RCW 60.28.011, a sum of 5% of the monies earned by the Contractor will be retained from progress payments. COVID-19 Job Site Requirements: The Contractor shall comply with all federal, state, and local laws and regulations related to COVID-19 applicable to this project and in effect at the time the work is performed. Additional Information: Contact the Public Works Department at (360) 370-0500 Prevailing Wages: This project is funded with State and local funds; Washington State wage laws and rules apply. In preparing a bid, contractors must use the prevailing wage rates in effect for San Juan County on the date bids are due

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents