Similar Projects
Last Updated | 12/22/2020 02:32 PM |
Project Title | Fence Replacement at CJAGMTC |
Physical Address | View project details and contacts |
City, State (County) | Newton Falls, OH 44444 (Trumbull County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Synopsis: Scope of Service is for the Removal of the existing Security Fence and replacement in kind with new Fence, Top rail, barb wire, posts and Gates where needed. The existing fence has been in place since the construction of the Base circa 1940. The new fence will meet current Military Standards. The area within 10 feet of the fence will be cleared for maintenance and security requirement. Antiterrorism Measures are to be included in accordance with the DOD Minimum Antiterrorism for building standards. The purpose of this synopsis is to gain knowledge of potential sources for this project including interested Small Business sources. This notice is for planning purposes only. All interested parties should respond. USPFO-OH intends to issue a solicitation and award of a contract to “Remove and Replacement of Existing Perimeter Security Fence on CJAGMTC”. Project Scope. Project site is located on the Camp James A. Garfield Joint Military Training Site (CJAGJMTC), 8451 State Route 5 Ravenna, Ohio 44266. CJAGJMTC is requiring the removal and replacement of Base Bid amount of 6,175 lineal feet of existing fence around the perimeter road. This project will be broken down into the base bid and Alternate options of various lineal feet and work scope. The Base Bid work begins at approximately Southern, Latitude & Longitude 41.162900, -81.097756 at the area known as the “Dormitory Road Gate”. The Alternate options are contiguous to the Base Bid and each other. These Options proceed clockwise (west) along the perimeter road. Necessary clearing, grubbing and cleanup of stumps and limbs that may impact the work area and the 10 foot security line of site. Vegetation clearing outside of the work area will be the minimum required to facilitate access to the work area. Vegetation clearing will comply with the Environmental Procedures regarding size, seasonal restrictions, and protection of nesting birds, bats, and other species. Installation of temporary fence to maintain the security of the Base. The fence line shall be secured at the end of each working shift by the contractor. If the contractor chooses, the fabric from the fence to be removed can be used for temporary fence with steel posts driven to secure. Area under and around the new fence shall be adequately graded to maintain clearances between the top and bottom as well as the 10 foot security zone. The fence line shall also be graded to drain as much as possible away from the fence to allow for future mowing and maintenance of the 10 foot security zone. All areas disturbed by construction shall be reseeded and mulched and a grass cover established as required in the Environmental Procedures |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |