Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Waterline Improvement - Kent Drive - City Of Brentwood
Alteration
Conception
$336,000 est. value
Brentwood, CA 94513

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

San Joaquin Pipeline Valve and Safe Entry Improvements - Phase 1B
Infrastructure
Bidding
$14,000,000 est. value
Stockton, CA

Almaden Valley Pipeline Inspection and Rehabilitation Project
Infrastructure
Bidding
$4,000,000 to $6,000,000 est. value
San Jose, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

California Village Infrastructure Project
Infrastructure
Post-Bid
Needles, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Repair Storm Damage
Alteration
Design
$2,662,000 est. value
Willits, CA 95490

Maintenance District 10A - Madera Ranchos Water System Improvements Project - Phase II
Term Contract
Bidding
$4,489,252 est. value
Madera, CA 93636

Water Main Capital Improvement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Vallejo, CA 94589

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Reported 06/22/2022 08:47 AM
Project Title

Coombs Street Water Main Upgrade Fifth to Ash - WD24UT05 - City of Napa

Physical Address View project details and contacts
City, State (County) Napa, CA 94559   (Napa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Napa, California. Conceptual plans call for site work for a water / sewer project. Water main upgrade of existing 110-year-old 6-inch cast iron pipe to an 8-inch pipe as part of the water utility's annual water main replacement program. The existing pipeline has exhibited multiple leaks. This section of Coombs St is on the upcoming Measure T Street Project schedule. Replacement of this line will increase reliability of flow in this neighborhood. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents