Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Pine Ridge High School HVAC Renovation
Post-Bid
Daytona Beach, Deltona, FL 32116

Rooftop Unit (RTU) Replacement
Results

HVAC and Ice Machine Repair and Sheet Metal Fabrication
Results
FL

Replacement of AHU 9 - Halifax Health 4th Floor CVOR
Post-Bid
Daytona Beach, FL 32116

Continuing Services: Test & Balance Services for HVAC
Results
FL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Timbercrest Elementary Replace Fresh Air Unit Building 7
Results
$155,000 est. value
Deltona, FL 32725

Replacement of AHU 9 - Halifax Health 4th Floor CVOR-CVICU Daytona Beach Campus
Term Contract
Post-Bid
Daytona Beach, FL 32114

Halifax Historical Society Museum Roof Replacement
Alteration
Results
$150,000 est. value
Daytona Beach, FL 32114

Replacement of Two (2) HVAC Systems
Term Contract
Post-Bid
Port Orange, FL 32127

Sheriff`s Training Facility HVAC Replacement Phase 2
Alteration
Results
$163,000 est. value
Daytona Beach, FL 32124

Hope Place HVAC Project
Term Contract
Post-Bid
Daytona Beach, FL 32116

HVAC Equipment Maintenance, Repair, Installation, and Replace Services-Various Locations North Region
Alteration
Results

Repair of 1250 Ton Chiller and Associated Chilled Water Equipment
Alteration
Post-Bid
Daytona Beach, FL 32114

Last Updated 07/07/2022 11:10 AM
Project Title

DeLand Courthouse Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Deland, FL 32724   (Volusia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value $609,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes replacement of the cooling towers and re-roofing of the sally-port at the Volusia County Courthouse, located at 101 N. Alabama Avenue, Deland FL 32724. The project includes: 1. Installation of a temporary cooling tower system to maintain HVAC functions at the Courthouse 2. Removal/ demolition of the existing two cooling towers 3. Installation of the two new cooling towers 4. Demolition of the roof over the sally-port. 5. Installation of the roof over the sally-port.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents