Similar Projects
Carpet Cleaning, Repair and Flood Restoration Services
Term Contract
Post-Bid
Arlington, TX 76019

Sun Valley Detention Pond
Post-Bid
Fort Worth, TX

Capp Smith Park Lake Retaining Walls 2019
Results
$550,000 est. value
Watauga, TX 76148

Upper Clear Fork Drainage Basin Interceptor Improvements
Results
Fort Worth, TX

Peach Elementary School Retaining Wall
Post-Bid
Arlington, TX 76006

EWP - Storm Debris Removal - Calhoun County Drainage District 11 - Calhoun County, TX
Results

Washington Drive Erosion Improvements
Post-Bid
$4,900,000 est. value
Arlington, TX 76010

Cleaning and Reshaping Ditches
Results
Less than $314,406 est. value
TX

Pond Maintenance
Post-Bid
Fort Worth, TX 76177

Upper Big Fossil Creek Drainage Basin Relief Interceptor
Results
Fort Worth, TX

Northeast Courthouse Retaining Wall Addition
Post-Bid
Fort Worth, TX 76054

Eagle Mountain Lake Drainage Basin
Results
Fort Worth, TX

Colleyville John McCain Road at Westcoat Drive Intersection Improvements
Post-Bid
Colleyville, TX 76034

2500 Block Austin Road Drainage Improvements in Richland Hills
Results
$60,000 est. value
Richland Hills, TX 76118

Brook Hollow Park Channel Improvements Phase 1-Sulphur Branch
Results
TX

Last Updated 01/04/2019 04:14 PM
Project Title

Fort Worth Zoo Creek Drainage Improvements

Physical Address View project details and contacts
City, State (County) Fort Worth, TX   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,075,293
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The major work will consist of the removal and replacement of paving and underground utilities, and the construction/installation of drainage improvements along Zoo Creek in Forest Park directly southwest of the intersection at McCart Avenue and Park Hill Drive. Improvements will consist approximately of the following: 1. Site demolition, excavation, grading, utility installation, paving, fencing 2. Installation of 530 LF of SDR - 26 24 in. DIP Water Pipe (City Main) 3. Removal of 241 LF of SDR-26 8 in. sewer line and a 4 ft. sewer manhole 4. Installation of 706 LF of 8 in. sewer line and a 4 ft. sewer manhole 5. Removal of existing drainage structures and storm drain lines 6. Construction and Installation (along a creek) of drainage structures 7. Construction of a 4,846 SF (face feet) of 2 ft. wide detention wall (height varies) 8. Installation of floodgates within the detention wall 9. Removal of existing vegetation, fencing, and paving 10. Construction of concrete vehicular paving 11. Construction of concrete pedestrian paving 12. Installation of aluminum and steel security fencing 13. Installation of landscape materials.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents