Similar Projects
Last Updated | 02/12/2021 09:20 AM |
Project Title | Community Justice Campus Site Finishing – Site Fencing |
Physical Address | View project details and contacts |
City, State (County) | Indianapolis, IN 46203 (Marion County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Site Finishing Fencing Scope of Work consists of, but is not necessarily limited to the following: 1. Fabricate and install all site fencing. a. Includes all type ‘SF’ Security fencing. b. Includes all type ‘DF’ Decorative fencing. c. Includes all type ‘A-C’ Anti-Climb fencing. 2. Fabricate and install all man-gates and vehicular gates within and directly adjacent to site fencing. a. Includes all type ‘G1’ Security gates b. Includes all type ‘G2’ Pedestrian gates c. Includes all type ‘G4’ Folding gates d. Includes all type ‘G5’ Double Leaf Swing gates 3. Furnish and install gate operators at type ‘G4’ and ‘G5’ gates. 4. Furnish and install electrified hardware and card reader mounting location at type ‘G2’ gates. 5. Furnish and install card reader pedestals at ‘G4’ and ‘G5’ gates. Pedestal model to be coordinated with owner and site security contractor. a. Entry call buttons, intercom camera, and pay verifier equipment provided and installed by others. All other components indicated in detail 6 on C108.3 are by this contract. 6. Free-standing type ‘G’ security gates are by others. 7. Electrical wiring to gate operators is by others. 8. Security wiring to gates is by others. a. Coordinate gate integration into security system with ADC/Sheriff’s contract. 9. Contractor is aware that multiple contractors are working onsite and that it will be necessary to coordinate with those contractors as well as the Owner team including a bi-weekly logistics meeting and other meetings as needed. 10. All digging needed to complete this scope of work is included in this contract. Any excess spoils are to be removed from the jobsite. GEN 05/20 NTB-2 11. This scope includes all manpower, equipment, materials, safety requirements, environmental submittals, permits, product submittals, etc., need to complete this scope of work. 12. All work is to be installed per DLZ’s Site Finishing for City of Indianapolis / Marion County Community Justice Campus Construction Drawings and Specifications. 13. Owner Allowances and Contingency a. Contractor to carry an Existing Perimeter Fence Removal Allowance of $25,000. b. Contractor to carry an Owner’s Contingency Allowance of $25,000. c. Contract allowance and/or any contingency dollars will be spent at the Owner’s discretion. Funds will be drawn from allowances and contingency only by Change Order or executed PCO. At closeout of Contract, funds remaining in Owner’s Contingency Allowance or other Allowances will be credited to Owner by Change Order. 14. Owner will contract separately for the following scopes of work to be completed during the listed time frames: a. Earthwork, storm, sanitary and waterline install: 9/1/2020 – 3/1/2021 b. Electrical and Low-voltage: 12/1/2020 – 9/10/2021 c. Site Concrete: 5/1/2021 – 9/10/2021 d. Asphalt: 5/1/2021 – 9/10/2021 e. Site Signage: 6/1/2021 – 9/10/2021 f. Landscaping: 5/1/2021 – 11/1/2021 15. Site Fencing Schedule Dates: a. All work in this scope is to be completed between 5/1/2021 and 9/10/2021. b. Contractor to assume multiple mobilizations to complete this scope of work. c. Substantial Completion for this Scope of Work is no later than 9/10/2021. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |