Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Wastewater Pump Station Improvements
Design
North Bay Village, FL

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Last Updated 12/16/2021 12:38 PM
Project Title

Lift Station Rehab at Cracker Trail Elementary

Physical Address View project details and contacts
City, State (County) Sebring, FL 33875   (Highlands County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization to job site. Pump wet well down and plug off wet well. Remove existing pipe, pump bases and rails. Have pump truck clean out wet well of all grease and debris, thoroughly clean. Install (2) new 3” base elbows and anchor to wet well floor, all hardware shall be stainless steel. Install new 3” schedule 80 pvc pipe and fittings for discharge pipe in wet well Excavate between wet well and valve pit and remove existing 4” iron pipe. Install new 3” schedule 80 pvc from wet well to valve pit, utilize existing 6” pipe as a sleeve Remove existing pipe, valves and fittings in valve pit. Install new brass check valves, gate valves and new 3” schedule 80 pvc pipe and fittings. Tie-in to existing discharge pip. Install (4) new stainless steel guide rails, (2 each pump base) and (2) new upper guide rail brackets, (1 for each rail system). Install (2) new Myers 3RH50M2-23 5hp pumps, 230 volt 3 phase with guide rail adapters, lifting bails, and stainless-steel lifting chain. Provide (1) extra new Myers 3RH50M2-23 5hp pump, (230 volt 3 phase). Delivered to School Board warehouse at 2120 E.O. Douglas Ave., Sebring, FL 33870. Install new floats necessary to make a complete operational system Apply SewperCoat, calcium aluminate, to rehab structural integrity to existing wet well Remove plug test pumps for proper operations

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents