Similar Projects
Clinical Care and Research Center - University of Nebraska Medical Center
New Construction, Infrastructure
Conception
$2,000,000,000 CJ est. value
Omaha, NE 68106

The Haven Residential Development
New Construction, Infrastructure
Conception
$24,000,000 CJ est. value
Omaha, NE 68022

24th and Lake Mixed-Use Development / Omaha
New Construction, Infrastructure - 120,000 SF
Design
$40,000,000 CJ est. value
Omaha, NE 68102

Civic Square - Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Design
$102,000,000 CJ est. value
Omaha, NE 68102

Site Grading, Retaining Wall, and Drive Entrance
Infrastructure
Bidding
$600,000 CJ est. value
Omaha, NE 68102

Terminal Entrance Drive Expansion, Phase 3
Addition, Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Omaha, NE 68110

Burger Detour
New Construction, Infrastructure - 2,258 SF
Sub-Bidding
$1,500,000 CJ est. value
Omaha, NE 68022

UNMC Scott Plaza Ice Rink Canopy
New Construction
Post-Bid
Omaha, NE 68105

S 156th Street and Internal - Sanitary, Storm Sewer & Paving
Infrastructure
Post-Bid
$300,000 CJ est. value
Omaha, NE 68102

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Maverick Landing of 72nd & Grocer St
Renovation
Results
Omaha, NE 68124

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

MPS - Buell Stadium Press Box
Addition, Demolition, Renovation, Infrastructure
Construction
$2,666,000 CJ est. value
Omaha, NE 68137

The Rows at Coventry
New Construction, Infrastructure
Pending Verification
$83,000,000 CJ est. value
Omaha, NE 68022

Central Library - City of Omaha
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Omaha, NE 68114

Last Updated 07/20/2023 02:36 PM
Project Title

Peter Kiewit Institute - Human-Centered Integrated Building Operation Lab

Physical Address View project details and contacts
City, State (County) Omaha, NE 68182   (Douglas County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $696,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Nebraska-Lincoln is requesting proposals from qualified bidders to provide all material and labor for the new construction building on the west side of the current Peter Kiewit Institute (PKI) for the Human-Centered Integrated Building Operation Lab. HVAC and plumbing will be stand-alone services. Electrical will be tied into the existing PKI building. 4/13/2022 02:00:00 PM (CT) Bidder Questions Deadline In order to be given consideration, any questions or requests for bid interpretation must be received by the University of Nebraska Procurement Services office no later than this date/time. Questions must be submitted to ebid@nebraska.edu. 4/15/2022 02:00:00 PM (CT) Final Addendum Deadline Project Description: Project consists of new construction on the west side of the current Peter Kiewit Institute for research lab. substantially complete and occupy the entire project not later than September 16, 2022, Punch list work for occupied spaces shall be completed not more than Thirty Days (30) calendar days from the date established for substantial completion.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents