Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Design
Nashville, TN 37219

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Design
Nashville, TN 37219

Bridge Rehabilitation
Infrastructure
Bidding
$3,000,000 CJ est. value
Carrollton, GA 30117

Bridge Rehabilitation
Infrastructure
Bidding
$3,000,000 CJ est. value
Carrollton, GA 30117

Automated Metering Infrastructure
Post-Bid
Temple, GA

Northeast Downtown Water Main Replacement, Phase I
Infrastructure
Post-Bid
Villa Rica, GA

2021 LMIG Project
Results
Mount Vernon, GA

T32-D6-Drain Rehab-Carroll-Haralson-117939
Results

Pavement Preservation and Maintenance Services – District 6
Infrastructure
Design
$700,000 CJ est. value
Carrollton, GA 30117

Lake Carroll Park Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Carrollton, GA 30117

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

T32-D6-Ppv-Edge Rut-Carroll-118819
Results
GA

SR 1/US 27 From CR 12/Stephens Road/Polk to Sr 746/Floyd
Infrastructure
Design
$9,000,000 CJ est. value
Bremen, GA 30110

Stream Restoration, Big Indian Creek Mitigation
Infrastructure
Post-Bid
GA

Last Updated 08/16/2022 10:36 AM
Project Title

University of West Georgia (UWG) Coliseum Parking Lot Sinkhole Repair

Physical Address View project details and contacts
City, State (County) Carrollton, GA 30117   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The project consists of repairing a failed portion of the existing 60" corrugated metal pipe underneath the Coliseum Parking Lot on the campus of the University of West Georgia. The project will include removing and replacing approximately 100 lf of the culvert pipe, saw-cutting and demolition of existing parking lot pavement as necessary for removal and replacement of the pipe and repair of the sinkhole, backfilling the sinkhole area, pavement replacement, installation and removal of temporary construction fencing around project limits, erosion control (installation, maintenance, and removal), and permanent vegetative stabilization. There are several utility lines within the project area that are critical to UWG's infrastructure, so care must be taken by the contractor to work around those utilities and keeping them active during construction. The contractor will be required to maintain good communication and coordination with Project Engineer, UWG Project Manager, and City Engineer throughout construction of the project. Proposals shall be evaluated by the Engineering Department of the City of Carrollton, GA based on the following criteria: 1. Total Bid Price - 50% 2. Quality of work and references based on examples provided and those developed by the City - 50% A score of 1 to 10 will be given for each of the above criteria and the scores weighted based on the percentages listed above. The Contractor with the highest total score will be selected for the project The City, in its sole discretion, reserves the right to select the Bidder that it deems most advantageous to the City The Instructions to Bidders, Bid Form, Contract Agreement, Drawings, Specifications, forms of Bid Bond, Performance Bond, Payment Bond and other Contract Documents may be examined at City of Carrollton 315 Bradley Street Carrollton, Georgia 30117 Each Bid must be accompanied by a Bid Bond duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570, in the amount of five percent of the bid. A letter of credit or bank guaranteed check, from a local bank, may be submitted in lieu of bond. Cash or personal checks will not be accepted. Each Proposal shall be submitted in a sealed envelope with the Contractor's name and their Georgia utility contractor license number, not the license number of a Utility Manager nor a subcontractor's Georgia Utility Contractor License Number, on the outside of the envelope. The envelope shall clearly state "Sealed Proposal for the UWG Coliseum Parking Lot Sinkhole Repair". The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid. The City reserves the right to reject any and all Bids, in whole or in part, with or without cause, and to waive informalities, technicalities or irregularities in the Bids or the Contract Documents. Also, this project is of sufficient complexity that the City reserves the right to reject any contractor who does not have previous experience with projects of a similar nature and complexity.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents