Similar Projects
Philmnt/Tomlinson/Pine Road Intersection
Infrastructure
Conception
Huntingdon Valley, PA 19006

North Narberth Avenue O/AMTRAK
New Construction, Infrastructure
Design
Narberth, PA 19072

23 Moore to Geerdes
Infrastructure
Design
King of Prussia, PA 19487

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Paving Project
Results
Willow Grove, PA 19090

2021 Milling Project
Results
$25,000 est. value
Willow Grove, PA

Ridge Pk Norris-Butler (W)
Infrastructure
Design
$10,393,000 est. value
PA

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Ridge Pike Improvement Project - Section D
Term Contract
Results
Norristown, PA

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

2021 Mill and Overlay Program
Results
Fort Washington, PA

Paving Restoration at Whitemarsh Elementary School, Ridge Park Elementary School and Plymouth Elementary School
Infrastructure
Post-Bid
$560,000 est. value
Lafayette Hill, PA 19444

2021 Road Improvements Project
Results
$200,000 est. value
Harleysville, Skippack, York, PA 19438

Last Updated 07/28/2022 09:34 AM
Project Title

2022 Mill and Overlay Project

Physical Address View project details and contacts
City, State (County) Jenkintown, PA 19046   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $247,327 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Per owner, all bids rejected, this will rebid at a future time. 2022 Mill and Overlay Project. This project includes the furnishing of all labor, materials, tools and equipment for the paving of selected roads within the Borough to include base repairs, milling, and paving. Bids must be submitted unconditionally. No bidder may withdraw a bid within SIXTY (60) days after the scheduled closing time for receipt of bids Each proposal must be accompanied by a certified check or bid bond payable to the Borough of Jenkintown in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed, to do business in the Commonwealth of Pennsylvania will be accepted and the bond shall so state same. All bidders submitting a bid greater than or equal to $100,000 are required to establish proof of competency and responsibility, in accordance with Jenkintown Borough Ordinance No. 2008-2, "An Ordinance of the Borough of Jenkintown Adopting a Model Responsible Contractor Ordinance". Bid surety checks and bid bonds will be returned to unsuccessful bidders after the awarding and signing of the Contract. The successful bidder(s) will be required to furnish Performance and Labor and Material Bonds in one hundred percent (100%) of the amount of the contract; a Maintenance Bond in the amount of twenty-five percent (25%) of the total contract price, as well as a Certificate of Insurance. If bid is greater than $100,000 for this Milling and Overlay project PA Prevailing Wages are required. The Borough reserves the right to waive any informality, or to reject any or all bids, or take such action as it may deem in the best interest of the Borough and as may be permitted by law. CLARIFICATION DEADLINE 7/14/2022 12:30 PM Estimated Cost: $175,000 to $200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. +1 669 900 9128 US (San Jose) +1 253 215 8782 US (Tacoma) Meeting ID: 852 9816 1115 Passcode: 087076 Find your local number: https://us02web.zoom.us/u/kehYs0DxUg

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents