Similar Projects
Yates Farm
New Construction, Infrastructure
Conception
$28,300,000 CJ est. value
Rogers, AR 72758

Bentonville Public Library Expansion
Addition, Renovation, Infrastructure - 65,055 SF
Design
$12,000,000 CJ est. value
Bentonville, AR 72712

Westside High School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Jonesboro, AR 72404

Tennis and Pickleball Complex Rebid
Infrastructure
Bidding
$17,266,763 CJ est. value
Morrilton, AR 72110

161kV Transmission Line Rebuild Project
Infrastructure
Bidding
$10,000,000 CJ est. value
Dardanelle, AR 72834

Palestine/Wheatley School District Block Fencing
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Palestine, AR 72372

Pipe, Fittings, and Valves
Term Contract
Sub-Bidding
Paragould, AR 72450

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Adcock Road Office Development
Demolition, New Construction, Infrastructure - 25,402 SF
Pending Verification
$5,000,000 CJ est. value
Hot Springs, AR 71913

The Woodlands of Sherwood
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Sherwood, AR 72120

RFQ Construction Manager at Risk - Midtown Corridor
Infrastructure
Design
$400,000 CJ est. value
Fayetteville, AR 72701

Last Updated 08/05/2022 02:04 PM
Project Title

Oppelo Sewer Pumping Upgrade

Physical Address View project details and contacts
City, State (County) Oppelo, AR 72110   (Conway County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $658,670 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Sewer Pump Station, Sewer Force Main, Lift Stations/Lift Station Equipment, Construction, Sewer and Water Construction, Water and Wastewater Facilities, Water/Wastewater Infrastructure, Electrical. Description: Replace existing vacuum sewer pumps and controls at two pump sites, and construct approximately 4,000 LF of 4" PVC forcemain. Additonal Description: *Crow Group, Inc is acting only as the engineering consultant and will not perform any construction or construction management for the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents