Similar Projects
Unit Upgrades, 48 Fairbank Circle 705-4
Bidding
$40,000 est. value
Sudbury, MA

On-Call Tub Refinishing Repairs
Bidding
$20,000 est. value
Lowell, MA

Weston Manor Shower Surrounds Installation
Post-Bid
Less than $75,000 est. value
Somerville, MA 02145

Shower Surround Installations at Various Developments
Post-Bid
Less than $99,000 est. value
Somerville, MA 02145

Crocker Hall Interior Renovations Phase 1 - General Bids
Results
Less than $660,000 est. value
Framingham, MA

Moisture Remediation Repairs
Results
$50,000 to $150,000 est. value
Framingham, MA 01701

Office Renovations Hale Middle School
Bidding
$80,000 est. value
Stow, MA 01775

Bryant Manor Shower Surrounds Installation
Post-Bid
Less than $95,000 est. value
Somerville, MA 02145

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Ceiling Tiles Removal and Replacement
Bidding
$515,000 est. value
Wilmington, MA 01887

Alterations for Buildings and Grounds at Farley - Filed Sub-Bids
Post-Bid
Framingham, MA 01702

Costello Basketball Suite Project - Filed Sub-Bids
Results
$3,000,000 est. value
Lowell, MA

Access Control Partitions
Post-Bid
Natick, MA 01760

Central Acton Water Treatment Plant Contract 1 - Filed Sub-Bids
Results
$6,800,000 est. value
Acton, MA 01720

Belmont Fire Department Headquarters Interior Repairs
Post-Bid
Less than $50,000 est. value
Belmont, MA 02478

Last Updated 02/04/2021 10:48 AM
Project Title

Interior Unit Improvements

Physical Address View project details and contacts
City, State (County) Acton, MA 01720   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovations of a single apartment unit including in particular renovations to the kitchen and bathroom, and the finish flooring throughout the unit. Renovations will include asbestos abatement at designated areas.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation.
Division 06 - Wood, Plastics, and Composites.
Division 09 - Finishes, Gypsum Board, Resilient Flooring, Resilient Tile Flooring, Painting.
Division 11 - Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Countertops, Plastic Countertops, Plastic-Laminate-Clad Countertops.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents