Similar Projects
Camp Mabry Sanitary Sewer and Water Valves Replacement Project
Infrastructure
Bidding
Less than $850,000 est. value
Austin, TX

Easton Park Segment F and G 36-Inch Water Transmission Main
Infrastructure
Bidding
$14,000,000 est. value
Austin, TX 78799

Pump Replacement Sprint For Lm6000
Post-Bid
Austin, TX 78767

Positioner for Samson Valves
Post-Bid
Austin, TX 78767

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Transmission Line Construction and Maintenance Services
Results
Less than $95,000,000 est. value
Austin, TX 78703

Phase 2 Raw Water Delivery System
Infrastructure
Bidding
$200,000,000 est. value
Round Rock, TX

Desuperheater Water Control Valve
Post-Bid
Austin, TX 78767

Underground Utility Locating Services
Results
Austin, TX 73301

Construction of 1080 24-Inch Transmission Main - Segment 'A'
Infrastructure
Bidding
$2,900,000 to $3,200,000 est. value
TX

Heritage Point at Wildhorse Ranch Section 4
New Construction
Post-Bid
Austin, TX 78653

East Allandale White Rock Neighborhood Water and Waterwaste System Renewal
Results
$3,809,500 est. value
Austin, TX 73301

Construction of Stallion Run Unit 1 and Unit 2
Infrastructure
Bidding
TX

Travisso Phase 4 and 5
Post-Bid
Leander, TX

2021 Waterline On-Call Services IDIQ (CIP 3920 2207 8220)
Term Contract
Results
Less than $6,000,000 est. value
Austin, TX 78704

Last Updated 01/11/2022 03:08 PM
Project Title

Pflugerville Water Pipeline Project

Physical Address View project details and contacts
City, State (County) Pflugerville, TX   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Bidding Expected March 2022, Construction Completion Expected October 2024
Bids Due View project details and contacts
Estimated Value $86,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

According to a water supply analysis recently presented to councilmembers, if Pflugerville’s current water system is not upgraded, the city will likely exceed its current firm water supplies in 2025. Project scope includes a $71 million 42-inch raw water line and a $3.7 million pump station rehabilitation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents