Similar Projects
Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Bidding

2022 Southern St. Clair County Paving Projects
Alteration
Bidding
$890,000 est. value
Saint Clair, MI

Central Division - Asphalt Paving Maintenance
Post-Bid

Paving & Site Lighting
Post-Bid

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

6.55 MI of Hot Mix Asphalt Reconstruction and Concrete Pavement Reconstruction, Fiber Relocation, Culverts, Guardrail, Signing and Pavement Markings
Results
MI

2022 St. Clair County Chip Seal Program
Alteration
Bidding
$1,157,000 est. value
Saint Clair, MI

Fire and Water Department Paving Project
Post-Bid
Fair Haven, MI

Southern St. Clair County Paving 2021
Results
Less than $1,020,000 est. value
Saint Clair, MI

2022 Local Paving
Infrastructure
Bidding
Allegan, Casco, Hopkins, Otsego, Salem, MI

2021 Street Improvements
Post-Bid
Yale, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Primary Paving
Infrastructure
Bidding
Casco, Dorr, Otsego, Salem, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

2021 Northern St. Clair County Paving Projects
Results
Less than $796,144 est. value
Saint Clair, MI

Last Updated 03/05/2022 01:51 AM
Project Title

12.94 MI of Single Chip and Fog Seal, Hot Mix Asphalt Shoulder Widening with Milled Corrugations and Pavement Markings on Kilgore Road From Lapeer Road North to Metcalf Road and From South of Mericle Road to South of Beard Road And Yale Road from the Yale City Limits to East of Duce Road

Physical Address View project details and contacts
City, State (County) MI   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Item No : 2203 034 Contract ID : 77000-205146 Control Sec : HRRR 77000, STL 77000 Job No : 211831A , 205147A , 205146A Federal No : 22A0199, 22A0200,22A0198 12.94 mi of single chip and fog seal, hot mix asphalt shoulder widening with milled corrugations and pavement markings on Kilgore Road from Lapeer Road north to Metcalf Road and from south of Mericle Road to south of Beard Road and Yale Road from the Yale city limits to east of Duce Road, St. Clair Count

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents