Similar Projects
Old Cypress Preserve- Infrastructure
New Construction
Conception
Longs, SC

Spencer's Trail
New Construction
Design
Anderson, SC

Improvements To The Highway Department Well - Lime Addition and Emergency Generator
Infrastructure, Alteration
Bidding
$850,000 est. value
Bishopville, SC 29010

Valley Public Service Authority Addition of Water Transmission Line and Dixie Clay Well Water Treatment System
Infrastructure
Bidding
Warrenville, SC 29851

Repair Submersible Pump
Post-Bid
Florence, SC 2906

CWS Plum Island PCPS Pump Base Plate Fabrication Project
Post-Bid
Charleston, SC 29402

CWS Hanahan Water Treatment Plant Pump and Motor
Results
Less than $217,761 est. value
Charleston, SC 29402

Mass Grading (Soil Stockpile Relocation) at the I-26 Industrial Park
Results
Less than $349,489 est. value
Columbia, SC

Olivia Springs
New Construction
Construction
Spartanburg, SC 29301

Luxury Rv Park
New Construction
Construction
Bluffton, SC

Kings Mountain Equestrian Campground Test Well 2
Infrastructure
Bidding
$15,000 to $25,000 est. value
Blacksburg, SC

Gas Powered Fish Pump
Post-Bid
Columbia, SC

Sitework Package for A Modular Unit at Mclaurin Elementary School
Results
Florence, SC 29506

Fox Rae Farms - Infrastructure
New Construction
Construction
Conway, SC 29526

Abandonment of Two (2) Groundwater Wells
Infrastructure
Bidding
Latta, SC 29565

Reported 12/17/2021 12:00 AM
Project Title

Drilling Services

Physical Address View project details and contacts
City, State (County) Clemson, SC   (Pickens County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The Department of Environmental Engineering and Earth Sciences is seeking a supplier to drilling three (3) shallow borings. 2. The geology of the area over the depth interval of the borings is expected to be characterized by shale with interbedded sandstone and limestone. The permanent water table is expected to be below the depth of the borings, but it is possible that perched groundwater is present at shallow depths. Air rotary drilling methods have been used to drill shallow borings in the vicinity of North Avant Field in the past. 3. Each boring will consist of drilling a 10-inch diameter boring to 40ft depth. Air rotary is the preferred drilling method. Then steel casing with a minimum 6-inch inner diameter will placed in the boring and sealed to the surface with neat cement or bentonite hole-plug. Then the offerer will drill a 6-inch diameter borehole below the bottom of the casing. The 6-inch diameter borehole will extend to a total depth of 140 ft. 4. The total length of air rotary drilling is 420 ft. The total length of casing is 120 ft. The total length of boring to be grouted is 120 ft. 5. The borings will be located at the North Avant Oil Field, 5 miles southeast of Barnsdale, OK and approximately 0.5 mile southwest of the small town of Wolco, Oklahoma. The UTM coordinates of one of the borings is: 761157.00 m E 4046752.00 m N and the others are within 500 yards

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents