Similar Projects
RFP Engineering - Work of Watershed Districts
Infrastructure
Bidding
$2,000,000 CJ est. value
Forest Lake, MN 55025

Design for Install Fire Suppression System at MCF-Stillwater
Alteration
Post-Bid
Bayport, MN 55003

Pre-Construction Condition Surveys
Infrastructure
Post-Bid
Lake Elmo, Mahtomedi, MN

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Architect-Engineer Environmental Services
Renovation, Term Contract
Post-Bid
$100,000 to $1,000,000 est. value

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

Middle Street Croix Valley Regional Trail Master Plan
Infrastructure
Post-Bid
Stillwater, MN

Solar Power System Design and Installation Master
New Construction, Infrastructure
Post-Bid

Saint Croix Valley Recreation Center Cost Analysis
Infrastructure
Post-Bid
Stillwater, MN

Region 9 Architect And Engineer Short Selection List
New Construction, Term Contract
Post-Bid
Milwaukee, WI

Architect-Engineer Services for Various Civil Works and Support for Other Agencies IDIQ
Renovation, Term Contract
Post-Bid
Less than $250,000,000 est. value

Stillwater Campus HVAC Replacement
Renovation, Alteration
Post-Bid
MN

Preliminary and Final Design Plan Set
Infrastructure
Post-Bid

CSAH 32 Pedestrian and Safety Improvement Project
Infrastructure
Post-Bid
Forest Lake, MN 55025

Last Updated 06/29/2023 10:06 AM
Project Title

Historic Courthouse Exterior Restoration

Physical Address View project details and contacts
City, State (County) Stillwater, MN 55082   (Washington County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $444,944 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 29, 2023 the project is in design. A construction timeline has not been confirmed. The Washington County Public Works Department is seeking construction management agent services (CMA) for design review through construction delivery of exterior restoration improvements to the Historic Courthouse in Stillwater MN. Washington County (hereinafter referred to as the COUNTY) makes this Request for Proposals (hereinafter referred to as RFP) in order to obtain Proposals for CMA services (Hereinafter referred to as the CONSULTANT) that will be used to select a consultant for the Project. The Project is generally described in the "Scope of Services" contained within this RFP. The Washington County Historic Courthouse is one of the oldest standing courthouses in Minnesota and was listed on the national register of Historic places in 1971. The Courthouse is a two-story brick-faced masonry building. The original courthouse was built in 1870 with subsequent additions (jail and what now is the vault exhibit space built in 1900) and a ramp and stairs at the west side of the courthouse is of the more recent construction. Parts of the main exterior stairs and walks have also been rebuilt more recently. Washington county moved the judicial services out of the building in 1975, and since that time, the building has undergone various renovation projects. The courthouse is now part of the Washington County Parks Division. Washington County parks department has hired on an architect/engineering firm and is in design of exterior improvements to the courthouse. These improvements include but are not limited to, structural repairs, dome assembly, roofing, water management, masonry repairs, stone foundation repairs, Architectural metals and woodwork, windows. Construction March - November 2023* CMA Scope 1. Project budget analysis, development, estimating, and tracking 2. Agency coordination, permitting, and approvals 3. Preconstruction services 4. Value engineering, safety, sustainability, and quality standards review at 90% 5. Design review and schedule development at 90% 6. Project staging development and implementation 7. Bidding services including bid analysis and recommendation 8. Construction inspection and contract administration 9. Management and coordination of final startup, testing, and occupancy 10. Project close out and warranty

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents