Similar Projects
Renovation of the Post Office Park
Infrastructure, Renovation
Bidding
$967,000 CJ est. value
Coal Valley, IL 61240

Renovation of the Post Office Park
Infrastructure, Renovation
Bidding
$967,000 CJ est. value
Coal Valley, IL 61240

Engineering Services for 30th Street Resurfacing
Infrastructure
Post-Bid
Rock Island, IL 61201

Engineering Services for 31st Avenue Resurfacing
Infrastructure
Post-Bid
Rock Island, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

HMA Resurfacing
Infrastructure
Results
$111,593 est. value
Hampton, IL

Third Street New Commercial Development
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
East Moline, IL 61244

Denkmann Park
Infrastructure
Bidding
$700,000 CJ est. value
Rock Island, IL 61201

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Deck Repair, Siding, & Handrails
Infrastructure, Alteration
Results
Rock Island, IL 61201

Bridge Deck Overlay, Misc Bridge Repairs - I 88
Infrastructure
Bidding
$600,000 CJ est. value
Hillsdale, IL 61257

US Route 6 Water Main Crossing
Infrastructure
Post-Bid
$400,000 CJ est. value
Moline, IL 61265

HMA Overlay and Miscellaneous Work
Infrastructure
Results
Andalusia, IL

Milling and Resurfacing the Silvis Maintenance Yard
Infrastructure
Bidding
$2,000,000 CJ est. value
Coyne Center, IL 61264

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Last Updated 02/17/2023 07:02 PM
Project Title

2023 Sidewalk Program

Physical Address View project details and contacts
City, State (County) Moline, IL 61265   (Rock Island County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $611,149 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall be performed in accordance with Section 108 of the Standard Specifications and the City of Molines Supplemental Specifications except as modified below: Sidewalk locations will be spread throughout the City of Moline. Locations will be provided to the Contractor at various times throughout the construction season. The Contractor should expect to mobilize and de-mobilize multiple times to complete this contract. In addition, the Contractor shall have 10 working days from the issuance of any additional locations to begin work on those locations. No more than five working days shall lapse from the time existing sidewalk is removed until replacement PCC sidewalk is placed at each site. All work shall be completed no more than ten (10) working days after existing sidewalk is first removed. Project work includes installing sidewalk in 3 locations in Moline, and also removal and replacement of existing sidewalk panels and ADA ramps in various locations throughout Moline. Work also includes modifications to the traffic signal at 7th Street and 41st Avenue Drive. As per 820 ILCS 130/1, prevailing wages shall be required for this project. Project questions shall be directed to Erin Bruner at (309) 524-2367 or ebruner@moline.il.us.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents