Similar Projects
Environmental Services Facility Improvements - City of Rocky Mount
Renovation, Infrastructure
Conception
$325,000 CJ est. value
Rocky Mount, NC 27804

Barnes Street Streetscape Project - Town of Nashville
Infrastructure
Conception
$1,250,000 CJ est. value
Nashville, NC 27856

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - Middlesex Corporate Centre Shell Building 2 Request for Design Build Bridging
New Construction, Infrastructure - 60,000 SF
Post-Bid
$800,000 CJ est. value
Middlesex, NC 27557

Western North Carolina Farmer`s Market Small Dealer`s Building
Renovation
Results

Manhole Replacement on Abbey Road
Infrastructure
Results
$217,135 CJ est. value
Rocky Mount, NC 27804

Whispering Hills Phase 2
New Construction, Infrastructure
Pending Verification
$7,800,000 CJ est. value
Spring Hope, NC 27882

Legacy Farms Subidivision
New Construction, Infrastructure
Pending Verification
$5,900,000 CJ est. value
Middlesex, NC 27557

2019 CWSRF Sanitary Sewer Project Contract No. 1 - Sanitary Sewer Replacement
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Bailey, NC 27807

2019 Clean Water State Revolving Fund Wastewater System Improvements
Renovation, Infrastructure
Results
$5,367,195 CJ est. value
Sharpsburg, NC 27803

Underground Boring at Lawrence Circle
Infrastructure
Post-Bid
$110,000 CJ est. value
Rocky Mount, NC 27804

Patching Repairs for Town Maintained Streets
Infrastructure
Post-Bid
$250,000 CJ est. value
Sharpsburg, NC 27803

Old Mill Road Sewer Pump Station Replacement & Force Main
Demolition, New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Rocky Mount, NC 27803

Amtrak Station Improvements
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Rocky Mount, NC 27804

Asphalt Repair Contract for Services
Infrastructure
Post-Bid
$400,000 CJ est. value
Sharpsburg, NC 27803

Last Updated 01/09/2023 01:06 PM
Project Title

RFQ D/B - Battle Park Trailhead Facility Design-Build

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27804   (Nash County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Site Development, Water Lines
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $235,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Direct all inquiries concerning this RFQ to: Antionette Goodwyn MWBE Coordinator Email: Antionette.Goodwyn@rockymountnc.gov Phone: 252-972-1236 As provided for under General Statue section 143-128. lA., The City of Rocky Mount ("The City") has elected to use design build as the contracting method for the construction of a new facility and amenities to be located at Trailhead at Battle Park located at 1308 Falls Road (Falls Road parking lot at Battle Park), Rocky Mount, NC 27804. All respondents to this Request for Qualifications (RFQu) are subject to the instructions communicated in this document and are cautioned to completely review the entire RFQu and follow instructions carefully The City of Rocky Mount ("The City") is requesting statements of qualifications from licensed design-builders in the State of North Carolina in compliance with G.S. 143-128. IA. for design and construction of a facility. This is a time-sensitive project. Qualified and Interested firms should have prior experience supporting related facility projects. They should also have the capacity to complete the design and construction and be open to the public no later than October 1, 2023. Please note that Battle Park will remain open to the public for the duration of the project. Project must be completed, opened to the public and invoiced no later than October 1, 2023. The project scope. (Old Reedy Creek Road Trailhead may be used as a reference / type facility) Design and construction of The Trailhead at Battle Park, to include: 1. Approx 25' x 25'. Half shelter. Half three-room restroom & janitor's chase / closet. Project is to include connection to City utilities (water, sewer, electric, fiber). 2. Installation of: a. Security features i. Cameras on building (TBD, like existing City, FUSUS ready) ii. License plate readers (2) iii. Cameras on BP Lane (2, like existing City, FUSUS ready) b. Bike rack (like existing City) c. Bike repair rack (per City specification) d. Bike wash station (per City specification) e. Picnic tables (like existing City) f. Park benches (like existing City) Project must be completed, opened to the public and invoiced no later than October 1, 2023. Submit Written Questions for Clarification No Later Than 12/16/2022 5:00 PM Response to Questions/Addendum 12/20/2022 5:00 PM

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents