Similar Projects
Tin Mill Sanitary Sewer Replacement
Post-Bid
Less than $3,500,000 est. value
Birmingham, AL

Furnace Hill and Tuscumbia Landing Water Line and Sanitary Sewer Extension
Post-Bid
Sheffield, AL

2019 Subbasin 3 Sanitary Sewer Repairs
Results
Less than $208,290 est. value
Tuskegee, AL

2018 Neighborhood Improvements
Results
Haleyville, AL 35565

Sewer Joint Grouting of Various Sanitary Sewers Mains in the Lake Forest Area
Post-Bid
Daphne, AL 36526

Halls Mill Sewer Extension
Results
Mobile, AL

CIPP Rehabilitation of Various Sanitary Sewers Mains in the Lake Forest Area
Post-Bid
$250,000 to $350,000 est. value
Daphne, AL 36526

1871 Development Pump Station and Force Main
Results
Northport, AL 35476

Shorter Sewer and Water Infrastructure Improvements
Post-Bid
Shorter, AL 36075

Bayou Drive, Fairway Boulevard, Fairhope Avenue Transmission System
Results
Less than $2,149,421 est. value
Fairhope, AL 36532

CDBG Snow Hill Area Water and Sewer Rehabilitation Project
Post-Bid
Hartselle, AL 35640

Don James Construction Sewer Extension
Results
Anniston, AL 36202

UAB Off-Site Septic System
Post-Bid
Less than $85,000 est. value
Birmingham, AL 35294

Sewer and Water Improvements for Briley Street, Collins Street, and Emogene Street
Results
Less than $1,750,000 est. value
Mobile, AL 36606

Sanitary Sewer System - Asset Management Program - Wylam Ps Service Area Comprehensive Rehabilitation
Post-Bid
$1,500,000 to $1,800,000 est. value
Birmingham, AL 35203

Last Updated 02/27/2020 11:18 AM
Project Title

Queen City Jumper Sewer Line (A19-0149 2019.006.001)

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,284,391
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water and Sanitary Sewer improvements along 21st Avenue, Queen City Avenue, 8th Street, 9th Street, and Paul West Bryant Drive and 8th Street Streetscape, which includes new roadway, parking bays, sidewalks, etc. The approximate quantities of said Project are as follows: approximately 4,900 l.f. (8” - 24”) sanitary sewer main and laterals at depths of 6’ to 28’, 2,200 l.f. (4” - 12”) water main, 1,100 l.f. water service, 500 l.f. storm drain, 2,000 l.f. curb and gutter and curb, 850 s.y. concrete sidewalk, 1,300 s.y. concrete pavement, 1,400 s.y. asphalt pavement, 15,000 s.y. wearing surface, miscellaneous utility conduit improvements for future lighting, and irrigation.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents