Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Coronado Waterline Improvement Project
Infrastructure
Bidding
Espanola, NM

Construction of The Vado Water System Improvements Project
Infrastructure
Bidding
La Mesa, NM

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

Construction of the Wastewater Collection Lines
Post-Bid
Cimarron, NM 87714

Valle Del Rio Water System Improvements
Results
La Mesa, NM

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Public Water System and Water Storage Tank Improvements
Infrastructure
Bidding
Acomita, NM

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

Water System Improvements
Results
Less than $1,082,681 est. value
Tularosa, NM

Richards Avenue East and Campo Conejo Master Meter Vaults
Infrastructure
Bidding
$950,000 est. value
Santa Fe, NM 87507

Rudolfo Road Water System Improvement Project
Post-Bid
Santa Fe, NM 87502

Construction of the Stern Waterline Extension
Results
$83,254 est. value
La Mesa, NM 88044

Black Mesa 3 Dam Outlet Raymac Dam to Mccoy Dam Phase V Project
Post-Bid
$3,464,000 est. value
Albuquerque, NM 87107

Water System Improvements Carnuel Waterline Phase 2C
Results
Less than $638,529 est. value
Albuquerque, NM 87103

Last Updated 09/27/2021 02:44 PM
Project Title

Priority Line Replacement

Physical Address View project details and contacts
City, State (County) Santa Fe, NM   (Santa Fe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Installation of all specified water mains, valves, blow-offs, fire hydrants and service connections, etc.. 2. Earthwork, grading and compaction for the restoring the driving surface over disturbed areas. 3. Coordination with Public Service Company of New Mexico (PNM) as required 4. Coordination with the New Mexico Gas Company as required 5. Coordination with Century Link as required 6. Coordination with New Mexico NM811 and/or contracting with utility location providers as required. 7. Coordination with the City’s Water Division for periodic review of system installations. 8. Coordination with the City’s Water Division as required for water main shut-off. 9. Any other related work associated with this work, as drawn and specified in the WO. 10. Provide all required materials testing. 11. Provide 12 month Contractor’s warranty on installed water distribution systems/lines, parts and labor. 12. Provide Manufacturer’s warranties on miscellaneous parts and labor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents