Similar Projects
Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Reconstruction - Bridge Deck Replacement - IOWA 210
New Construction, Infrastructure
Bidding
IA

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

2nd Avenue Bridge over the Des Moines River Rehabilitation and 2nd Avenue Bridge over Birdland Drive Replacement
New Construction, Infrastructure
Post-Bid
Des Moines, IA 50982

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Abutment Repair - U.S. 61
Renovation, Infrastructure
Bidding
IA

Pedestrian Bridge at Morgan Creek Park Phase 2B
New Construction
Post-Bid
IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Replacement - CCS - S34 T96 R26
New Construction
Bidding
IA

2022 Local Bridges
New Construction, Infrastructure
Post-Bid
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Bridge Replacement - CCS - S14 T81 R12
New Construction, Infrastructure
Bidding
IA

Reported 03/12/2022 12:00 AM
Project Title

Lock and Dam

Physical Address View project details and contacts
City, State (County) Le Claire, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design, fabrication and installation of a new bascule bridge that crosses the lock chamber and meets or exceeds AASHTO HL-93 loadings. This new bridge replaces an existing floating bridge. The project may also include but is not limited to the construction of new approaches, abutments and installation of operational machinery and controls.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents