Similar Projects
Z1da--Construction IDIQ 2021 - Ohio - General Five Year General Construction Indefinite Delivery- Indefinite Quantity Contracts for VA Medical Centers Located in Indiana
New Construction
Design
$20,000 to $16,000,000 est. value

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

Building A-1 Modifications at Facility One
Renovation
Bidding
$898,700 CJ est. value
Toledo, OH 43605

Construction of New Auxiliary Building
New Construction, Infrastructure
Bidding
$1,800,000 CJ est. value
Toledo, OH 43612

Traffic Marking Paint - Rebid
Term Contract
Sub-Bidding
Toledo, OH 43604

2022 Janitorial Services
Term Contract
Sub-Bidding
Oregon, OH 43616

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Logistics Support: Lights-Generators-Portable Toilets / Showers
Post-Bid
$900,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

New Lucas County Canine Care And Control Center
New Construction
Design
Toledo, OH

Secondary Hauling Services
Term Contract
Sub-Bidding
Toledo, OH 43604

Backflow Preventer Maintenance
Post-Bid
Toledo, OH

Access Control Point Program Design Build II -- RFI(2)
Results

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Last Updated 08/05/2022 03:32 AM
Project Title

Manual Solar Shades/Window Treatments Toledo Service Office

Physical Address View project details and contacts
City, State (County) Toledo, OH 43604   (Lucas County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Misc. Buildings, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Manual solar shades 1.02 SUBMITTALS A. Manufacturer's complete CSI 3-part specification sheet. B. Submit working hand sample or mockup shade as required. C. Submit two 4" x 6" samples of shade fabric material indicating color and dimensions. 1.03 DELIVERY, STORAGE AND HANDLING A. Product to be delivered in manufacturer's original packaging. B. Products to be handled and stored to prevent damage to materials, finishes and operating mechanisms. Store in a clean, dry area, laid flat to prevent sagging and twisting of packaging. PART II - PRODUCTS 2.01 Manufacture and Product Description 2.02 Manual Solar Shades A. Product: SWFcontract manual solar shade a. Solar shade fabric shall be flame retardant, fade and stain resistant, anti-static, anti-microbial and pass NFPA 701-1999 FR and ASTM-G21 and G22. Shades with railroaded fabric will have heat-welded seams. Styles A, B, C: Fabric Style: Crosshatch R500 Color Name: White/Fog Color Number: C8314 Openness Factor: 5% Quantities: (3) corner windows approx. 58" W x 108" H (11) single windows approx. 40" W x 108" H Note: (2) single window shades will be kept for attic stock. (43) double windows approx. 86" W x 108" H Styles D, E, F: Fabric Style: Crosshatch R100 Color Name: White/Fog Color Number: C7914 Openness Factor: 1% Quantities: (1) corner window approx. 58" W x 108" H (6) double windows approx. 86" W x 108" H (1) single window approx. 40" W x 108" H Style G: Fabric Style: Parallel Color Name: White/Fog Color Number: C9818 Openness Factor: Blackout Quantities: (2) double windows approx. 86" W x 108" H b. Roller tube shall be extruded aluminum engineered with a channel to accept fabric spline. The tube size will be determined by the manufacturer based on window size and fabric selection. c. Clutch system shall be made of glass-reinforced, polyester thermopolymer (PBT) for wear resistance, smooth operation and corrosion resistance. The clutch is comprised of multi-banded, steel springs that lock the shade in any position when operating the control loop. The clutch mechanism is bi-directional and never requires adjustment or lubrication. d. Control loop shall be a #10 stainless steel bead chain. Bead stops attached to the chain protect the shade from over rotation. e. Idler end shall be made of high strength, glass-reinforced, polyester thermopolymer (PBT) for wear resistance, smooth operation and corrosion resistance. f. Lift assist system shall be a heavy-duty torsion spring located inside the roller tube. The mechanism reduces the pull force allowing easy lifting of larger shades. g. Spline system shall consist of a PVC spline heat-welded to the shade fabric and inserted into a channel on the roller tube. The spline system allows for adjustability on-site and ease in changing fabric panels in the field. h. Hem bar shall be an aluminum extrusion enclosed in a fabric hem pocket with heat-welded seams and ends. Optional fabric wrapped hem bar. i. Battens shall be enclosed in a heat-welded pocket providing additional stabilizing on large shades. Batten placement will be determined by the manufacturer based on window size and fabric selection. j. Installation brackets shall be .125" thick steel and can accommodate overhead, side and face mounting. Optional dual shade brackets shall hold two shades in one bracket assembly. Coupled shades shall be connected with a linking bracket mechanism. 2.03 OPTIONAL ACCESSORIES SECTION INTENTIONALLY DELETED. 2.04 FABRICATION A. Shades shall be fabricated according to specifications and accurate to tolerance established by SWF engineering standards. B. Fabricate shades to hang flat without buckling or distortion. PART 3 - EXECUTION 3.01 INSPECTION A. Installer shall be responsible for inspection of jobsite, approval of mounting surfaces, blocking for shade brackets or pocket assemblies, verification of field measurements and installation conditions. Installation shall commence when satisfactory conditions are met. 3.02 DEMOLITION A. Existing draperies and all associated hardware to be removed and disposed of offsite. 3.03 INSTALLATION A. Install shades in accordance with manufacturer's instructions including recommended support brackets and fasteners. B. Install shades to cover/ conceal locations of previous hardware and fasteners. C. Install shades with adequate clearance to permit smooth operation of the shades throughout entire operational range. Installer will demonstrate shades to be in smooth, uniform working order. D. Patch and repair existing drywall as required. 3.04 MAINTENANCE AND CLEANING A. Shades may be vacuumed with a soft brush attachment or cleaned with mild soap and water solution. Do not use cleaning methods involving heat, bleach, abrasives, or solvents. Use of these methods will void the warranty. Process Awarded to lowest responsive and responsible quote, provided, cumulative spend does not exceed annual threshold limits, per the Ohio Revised Code (R.C.) 125.035 and 125.05 and Ohio Administrative Code (OAC) 123:5-1-17.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents