Similar Projects
CBJTC Precinct Road North Culvert Replacement
Bidding
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Bidding
Less than $350,000 est. value
Starke, FL

Cone Park Soccer Field Drainage Improvements
Post-Bid
Gainesville, FL 32641

Construction Manager at Risk Town-Wide Overhead Utility Undergrounding Phase 2 & 3 - South
Post-Bid
West Palm Beach, FL

County Road 880 Twenty Mile Bend Slope Protection
Results
$1,050,000 est. value
FL

Construction Engineering and Inspection Services for Old Plank Road Drainage Improvements
Results
Jacksonville, FL

CBJTC East Bay Road Washout Repair
Bidding
Less than $500,000 est. value
Starke, FL 32091

Natural Resource Conservation Service (NRCS) 101 Ranch Wetland and Reserve Easement Restoration, Okeechobee County, FL
Post-Bid
$500,000 to $1,000,000 est. value
Okeechobee, FL

Craig Park Seawall Restoration
Results
Less than $310,200 est. value
Tarpon Springs, FL 34688

CBJTC Gulfport Street Washout Repair
Bidding
Less than $420,000 est. value
Starke, FL 32091

S-252 D, E & F Culvert Repair Project, Indian River County, Florida
Post-Bid
$2,000,000 to $5,000,000 est. value
FL

Golf Links Stormwater Improvements
Results
Less than $232,359 est. value
Crestview, FL

CBJTC Mosley Road Washout Repair
Bidding
Less than $500,000 est. value
Starke, FL 32091

Asphalt Paving, Resurfacing and Drainage
Term Contract
Post-Bid
FL

Bay Drive Park Sitework Construction
Results
Less than $1,486,427 est. value
FL

Last Updated 02/28/2019 11:11 AM
Project Title

South Regional Lake Phase 1

Physical Address View project details and contacts
City, State (County) Fellsmere, FL   (Indian River County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provide materials, machinery, equipment, labor and utilities to construct the South Regional Lake-Phase 1. a stormwater park, including but not limited to: earthwork,subgrade, base, surface course, drainage structures and pipes, and ancillaries.
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents