Similar Projects
New Fire Station
New Construction
Conception
East Peoria, IL 61611

New Fire Stations
New Construction
Conception
Pekin, IL

HQ Residences
New Construction, Demolition - 3,200 SF
Design
Mount Prospect, IL 60056

Police Headquarters Redesign
New Construction - 101,000 SF
Design
$35,000,000 est. value
Rosemont, IL

Stark County Emergency 911 Dispatch Center Addition
Addition, Demolition, Infrastructure
Bidding
$110,000 CJ est. value
Toulon, IL 61483

Interior Renovations
Renovation
Bidding
$200,000 CJ est. value
Wauconda, IL 60084

Station 54 Remodel
Renovation
Post-Bid
Lisle, IL 60532

Douglas Park Fire Station #5 - Restoration Phase One
Renovation, Alteration
Post-Bid
Rock Island, IL 61201

Fire Training Facility
Results
Sugar Grove, IL 60554

Quincy Central Fire Station Restroom Renovation
Renovation
Results
Less than $100,000 est. value
Quincy, IL 62301

New Law Enforcement Center
New Construction
Construction
Newton, IL 62448

Fire Station No. 7
New Construction - 6,800 SF
Construction
Decatur, IL 62521

Fire Station 35 Remodel
Renovation
Pending Verification
Park Ridge, IL

Fire Station 36 Remodel
Renovation
Pending Verification
Park Ridge, IL

Former Police Station Redevelopment
New Construction
Conception
Saint Charles, IL

Last Updated 11/14/2022 10:03 AM
Project Title

EMS Day Room Interior Remodel

Physical Address View project details and contacts
City, State (County) Herscher, IL 60941   (Kankakee County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $79,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 14 ,2022, this project has not yet been awarded. A timeline for award has not yet been established.** We will use standard AIA Documents A101, Standard Form of Agreement Between Owner and Contractor 2017 Edition and A201, General Conditions of the Contract for Construction. The project is to be let to a single general contractor. Standard 10 percent retention amounts will be utilized in the agreement. For access to the project during bidding, please contact Chief Alan Ramsey, Ph. 815-351-7271. Other Bidding Instructions Direct questions to the Architect. Bid Bond is not required. Performance Bond and Labor & Materials Payment Bond is not required.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents