Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Jones Boulevard Improvements
Infrastructure
Bidding
North Liberty, IA 52317

Jones Boulevard Improvements
Infrastructure
Bidding
North Liberty, IA 52317

5th Avenue Storm Sewer Project
Infrastructure
Post-Bid
$96,500 est. value
Coralville, IA

Cedar River Crossing and Sutliff Bridge-West Area Improvements
New Construction, Infrastructure
Post-Bid
Oxford, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Melrose Avenue / IWV Road - Highway 218 to Hebl Avenue Improvement
Infrastructure
Results
$5,100,000 est. value
Iowa City, IA 52240

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Bidding
$190,000 est. value
Oxford, IA

2022 Bituminous Resurfacing
Infrastructure
Post-Bid
IA

2021 Water Pavement Patching
Infrastructure
Results
$132,000 est. value
Iowa City, IA

Asphalt Resurfacing 2022 Project
Infrastructure
Bidding
$300,000 est. value
Iowa City, IA

Muddy Creek Lane Patching and Subdrain
Infrastructure
Results
$143,810 est. value
Coralville, IA

Phillips Hall - Repair ADA Ramp at Entrance 4
Infrastructure
Bidding
$39,390 est. value
Iowa City, IA 52245

Trailhead Plaza at Creekside Cross and Flow Trails
Infrastructure
Results
Coralville, IA 52241

Public Housing Pavement Repair
Infrastructure
Results
$147,000 est. value
Iowa City, IA

Last Updated 04/15/2022 12:24 PM
Project Title

3rd Street Reconstruction

Physical Address View project details and contacts
City, State (County) Hills, IA 52235   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of the full reconstruction of approximately 4,235 linear feet of an existing rural HMA street section to a 31-foot wide 7 PCC street with curb, gutter and storm sewer. Improvements include all labor, materials and equipment necessary to construct 7 PCC on a 6 modified subbase, longitudinal subdrain, driveways, 6 PCC sidewalk, intakes, storm sewer, 6 PVC water main, 8 sanitary sewer, sanitary and water services, retaining wall, HMA alley and transitions, traffic control, earthwork, erosion control, seeding and miscellaneous associated work including clean-up and restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents