Similar Projects
Tupelo North
New Construction, Infrastructure
Conception
$80,999,928 CJ est. value
Mebane, NC 27302

New Fire Station - City of Mebane
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Mebane, NC 27302

11Th Street Apartments
New Construction
Design
Mebane, NC

Wyndham Hotel Garden and Hawthorne Suites
New Construction, Infrastructure - 5,000 SF
Design
$40,000,000 CJ est. value
Mebane, NC 27302

Clay Street Infrastructure Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Mebane, NC 27302

Alamance County Municipal Solid Waste Landfill - Phase 6 New Cell and C & D Landfill Cap
Infrastructure
Bidding
$500,000 CJ est. value
Graham, NC 27253

Burlington Athletic Stadium
Addition, Demolition, New Construction, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Burlington, NC 27217

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CDBG Ruby Lane Walking Trail Connection
Infrastructure
Post-Bid
Burlington, NC

Cane Creek Mountain Phase II Parking Lot Improvement on Bass Mountain Road
Results
NC

Recycling Improvements, Phase 2
Infrastructure
Results
$678,000 est. value
Graham, NC 27253

Meadows Residences (Mebane)
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Mebane, NC 27302

North Mebane Village
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Mebane, NC 27302

Mebane Community Park Fiddler Stage
Infrastructure
Bidding
$300,000 CJ est. value
Mebane, NC 27302

2022 Security Vestibules
Renovation, Infrastructure
Post-Bid
Graham, Haw River, NC 27253

Last Updated 01/18/2023 02:39 PM
Project Title

Maple Avenue Corridor Plan

Physical Address View project details and contacts
City, State (County) Burlington, NC 27215   (Alamance County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $47,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for slowing down traffic along most of Maple Avenue by eliminating some traffic lanes on the mostly five-lane road, put islands in the median for pedestrian safety, widen sidewalks, add benches and trees, and get businesses to connect their parking lots and parcels so cars and pedestrians can travel short distances without getting onto the main road. As of January 18 2023, this project is still in a design state as per source. An engineer has been selected. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents