Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Bridge Replacements on I-474
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Peoria, IL 61605

Bridge Replacements on I-474
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Peoria, IL 61605

Culver's / Peoria
New Construction, Infrastructure - 4,905 SF
Sub-Bidding
$1,500,000 CJ est. value
Peoria, IL 61615

ADA Sidewalk
Post-Bid
Chillicothe, IL

Seal Coat
Alteration
Post-Bid
Princeville, IL

Illini Bluffs Saylor Street Parking Lot Phase 1
Results
Less than $211,770 est. value
Glasford, IL 61533

Asphalt Path Replacement at Rock Island Greenway
Results
Peoria, IL

Bus Stop Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Peoria, IL 61603

2021 North Valley Sidewalk Improvements
Alteration
Post-Bid
Peoria, IL

Crack and Joint Sealing at Various Locations in Knox, Peoria, and Tazewell Counties
Results

Riverfront Park Paver Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Peoria, IL 61602

Second Street ADA Sidewalk
Infrastructure
Post-Bid
Chillicothe, IL 61523

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Last Updated 09/16/2022 05:35 AM
Project Title

Parking Lot Reconstruction Peoria Playhouse Children's Museum

Physical Address View project details and contacts
City, State (County) Peoria, IL 61603   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A list of plan holders can be obtained upon request. This information will be available up to twenty-four (24) hours prior to the scheduled bid opening time. After that deadline, no information pertaining to the project will be given. A 10% Bid Bond is required, and is to be included with the Bid Proposal. The successful Bidder will be required to furnish a 100% Performance Bond and a 100% Labour and Materials Payment Bond within ten (10) days of formal Award of Contract. The general prevailing rate of wage for the Peoria area shall be paid for each craft or type of worker needed to execute this contract or perform this work as required by the State of Illinois Department of Labour. Additionally, it is required that provisions of the Illinois Preference Act, the Illinois Drug Free Workplace Act, and the Substance Abuse Prevention on Public Works Act must be adhered to. Bidders are also advised that contract documents for this project include the non-discrimination, equal opportunity and affirmative action provisions in the Human Rights Act and rules and regulations of the Department of Human Rights. The Peoria Park District is an AA/EEO organization and encourages participation by minority and female-owned firms. The Peoria Park District reserves the right to reject any or all bids, waive technical deficiencies, informalities or irregularities or rebid any project. Remove and replace asphalt paving, remove and replace stormwater piping, inlet, and manhole

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents