Similar Projects
2021 Roadway Resurfacing Program, Curb Ramp, Sanitary Sewer and Stormwater Structure Repairs
Infrastructure
Bidding
Phillipsburg, NJ

2021 Sanitary Sewer Repairs and Rehabilitation
Infrastructure
Bidding
Matawan, NJ

Providing Pipeline Cleaning, CCTV Inspection, and/or Combined CCTV/Sonar Inspection Services
Term Contract
Post-Bid
Elizabeth, NJ 07202

Sewer and Manhole Rehabilitation
Post-Bid
Toms River, NJ 08753

Barnsboro Sanitary Sewer Extension Project
Results
Mantua, NJ 08051

Emergency Sewer Lateral Repairs
Results
Paterson, NJ

Water/Sewer Emergency Repairs and Service Work
Infrastructure
Bidding
Jackson, NJ

Diamond Drive Pump Station Rehabilitation
Post-Bid
Waretown, NJ 08758

Passaic Valley Water Commission High Crest Pump Station Discharge Piping Upgrades
Results
Clifton, NJ 07011

Sanitary Sewer Root Control Retreatment and Inflow Infiltration (II) Microdetection
Infrastructure
Bidding
Woodbridge, NJ

2020 Sewer System Coating, Lining and Restoration
Term Contract
Post-Bid
Somers Point, NJ 08244

Sewer Main Repairs and Replacement
Results
Paterson, NJ 07505

Union Mill Farms Force Main Replacement
Infrastructure
Bidding
Less than $500,000 est. value
Mount Laurel, NJ

2020 Proposal Influent Grinders for Wastewater Stations
Term Contract
Post-Bid
Somers Point, NJ 08244

2020 Sanitary Sewer Clean and TV
Results
$50,396 est. value
Summit, NJ

Last Updated 09/28/2021 10:24 AM
Project Title

West Main Street Sanitary Pump Station Improvements Phase 1

Physical Address View project details and contacts
City, State (County) High Bridge, NJ   (Hunterdon County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $116,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project improvements consist of but is not limited to installation of new flowmeter manhole and new bypass connection, fence replacement; maintenance of service, dewatering as required; and site restoration and repaving as required.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents