Similar Projects
Ewert Park Improvement - City of Joplin
Renovation, Infrastructure
Conception
$5,829,375 CJ est. value
Joplin, MO 64801

O'Reilly Auto Parts (J3) #4070 / Joplin
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Joplin, MO 64801

Existing Traffic Signal Upgrades - 4th & Murphy Signal Project - TC0516 - City of Joplins
Infrastructure
Design
$1,000,000 CJ est. value
Joplin, MO 64801

$PRESS - 32nd Street Place - Ross Construction Group LLC
New Construction, Infrastructure
Design
$188,000,000 CJ est. value
Joplin, MO 64801

Whataburger - S Madison St / Webb City
New Construction, Infrastructure - 3,318 SF
Bidding
$1,000,000 CJ est. value
Webb City, MO 64870

Whataburger - S Madison St / Webb City
New Construction, Infrastructure - 3,318 SF
Bidding
$1,000,000 CJ est. value
Webb City, MO 64870

Lowe's XDT / Joplin
New Construction, Infrastructure - 63,000 SF
Post-Bid
$6,800,000 CJ est. value
Joplin, MO 64801

Expansion to the Existing Parking Lot
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Carthage, MO 64836

Parking Lot and Trail Sealing 2022
Infrastructure
Results
Joplin, MO 64801

Microsurfacing 2022
Infrastructure
Results
Joplin, MO 64804

Performing Arts Center - Carthage R-9 School District
Demolition, New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Carthage, MO 64836

32nd Street Place Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$34,500,000 CJ est. value
Joplin, MO 64804

Asphalt
Infrastructure
Post-Bid
Webb City, MO

Joplin ADA Ramp Improvements
Infrastructure
Results
$400,000 est. value
Joplin, MO

WestRock - Addition / Joplin
Addition, Demolition, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Joplin, MO 64804

Last Updated 08/16/2023 03:34 AM
Project Title

Carthage Citywide Sidewalk Improvements, Phase 5

Physical Address View project details and contacts
City, State (County) Carthage, MO 64836   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of ADA compliant sidewalks, curbs, gutters, stormwater improvements, crosswalks and appurtenances. Pre-Bid Meeting Info: N/A Pre-Qualification: Yes All questions concerning the bid document preparation and project specific questions can be directed to Sean Matlock, PE, OWN, Inc., (417) 793-7680. The contractor questionnaire must be on file 7 days prior to bid opening. Liquidated Damages for failure or delay in completing the work on time for this contract shall be in accordance with Sec 108.8. The liquidated damages include separate amounts for road user costs and contract administrative costs incurred by the Commission. Work zone traffic management shall be in accordance with applicable portions of Division 100 and Division 600 of the Standard Specifications, and specifically as follows.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents