Similar Projects
Potawatomi Tower Revitalization
Infrastructure
Conception
$1,000,000 CJ est. value
Sturgeon Bay, WI 54235

Walk, Bike and Eggsplore Egg Harbor Const / Misc Ped / Bike Trail
Infrastructure
Design
$2,000,000 to $3,000,000 est. value
Egg Harbor, WI 54209

Facilities and Parks Maintenance Garage Addition and Remodel
Addition, Demolition, Renovation, Infrastructure
Bidding
$280,000 CJ est. value
Sturgeon Bay, WI 54235

Asphalt Replacement Program
Infrastructure
Post-Bid
Sturgeon Bay, WI

Pulverize and Pave with Hot Mix Asphalt
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Alley Reconstruction
Results
$664,705 est. value
Whitefish Bay, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

South Duluth Avenue Apartments
New Construction, Infrastructure - 77,680 SF
Pending Verification
$22,000,000 CJ est. value
Sturgeon Bay, WI 54235

Egg Harbor Road Rental Townhomes / Cherry Tree Terrace & Apple Tree Terrace
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Sturgeon Bay, WI 54235

Mill Road Improvements
Infrastructure
Post-Bid
$350,000 est. value
Sister Bay, WI 54234

Wilson Road Resurfacing
Infrastructure
Results
Sturgeon Bay, WI 54235

Construct Boat Access Parking Area Rowleys Bay
Infrastructure
Construction
$178,000 CJ est. value
Ellison Bay, WI 54210

YMCAs Sturgeon Bay Addition
Addition, Demolition, Infrastructure - 16,300 SF
Pending Verification
$4,200,000 CJ est. value
Sturgeon Bay, WI 54235

Last Updated 11/03/2022 11:33 PM
Project Title

Repair and Replace Main Access Roads

Physical Address View project details and contacts
City, State (County) Fish Creek, WI 54212   (Door County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,415,547 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of clearing and grubbing, milling of existing asphalt, pulverize and relay of existing asphalt, base aggregate dense, excavation below subgrade, asphalt paving, culvert replacement, landscaping, and placement of pavement markings. No prebid tour will be conducted.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents