Similar Projects
Fire Headquarters and EOC - 18177 - City of Corpus Christi
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Corpus Christi, TX 78401

North Beach Area Primary Access - 18033A - City of Corpus Christi
New Construction, Infrastructure
Conception
$1,025,000 CJ est. value
Corpus Christi, TX 78409

7-Eleven #210-424 / Corpus Christi
New Construction, Infrastructure - 4,754 SF
Design
$800,000 CJ est. value
Corpus Christi, TX 78412

Kram ST New Warehouses
New Construction, Infrastructure - 16,000 SF
Design
$2,275,000 CJ est. value
Corpus Christi, TX 78413

Airport Road (Morgan Avenue to Horne Road) Bond 2020
Infrastructure
Bidding
$7,375,290 CJ est. value
Corpus Christi, TX 78405

RFQ Engineering - Professional Engineering Services for Packery Channel Living Shoreline
Infrastructure
Bidding
$3,738,000 CJ est. value
Corpus Christi, TX 78401

Gulf Intracoastal Waterway, Texas, Placement Area No. 118-A Dike Raise and Shoreline Erosion Protection
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Corp Christi, TX 78401

Maintenance and Repair Services for Odor Control Systems
Renovation
Post-Bid
$215,000 est. value
Corpus Christi, TX

Citywide Lift Station Repairs (Williams Lift Station)
New Construction
Results
$11,615,000 est. value
Corpus Christi, TX

O.N. Stevens Water Treatment Plant Filter Building Rehabilitation - Phase 2
Renovation
Results
$1,341,176 CJ est. value
Corpus Christi, TX 78410

Citywide Lift Station Repairs (Wooldridge LS and Morgan LS)
Renovation
Construction
$5,524,493 est. value
Corpus Christi, TX 78414

Superior Trailer
New Construction, Infrastructure - 12,250 SF
Construction
$2,014,000 CJ est. value
Corpus Christi, TX 78406

O. N. Stevens Water Treatment Plant Solids Handling & Disposal Facilities
Renovation
Pending Verification
$42,864,000 CJ est. value
Corpus Christi, TX 78401

Port Aransas Hotel And Conference Center
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Port Aransas, TX 78373

Car Rental Ready Return Parking Lot - 23101 - City of Corpus Christi
Infrastructure
Conception
$675,000 CJ est. value
Corpus Christi, TX 78406

Last Updated 07/25/2023 02:21 PM
Project Title

Restoration of S.E.A. District Water Features - Part 1 Water Gardens Fountain

Physical Address View project details and contacts
City, State (County) Corp Christi, TX 78401   (Nueces County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2021 , Construction documents
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 31, 2020, there were no bids and it will be rebid in the future. For Water Gardens Fountain The scope of improvements for Part 1, the existing Water Gardens Fountain, the existing underground vault will be abandoned-in-place; the equipment will be removed; and, the vault backfilled with sand. A new above-ground pump house will be constructed at the northwest corner of the Selena Auditorium. The new pump house will contain new pumps and water quality equipment and new electrical systems and controls. The new pump house will connect to the existing fountain display and recirculation piping on the east side of the fountain. And, the existing fountain lighting will be replaced with LED lights. Part 1 Additive Alternate No. 1 includes the restoration of the surface of the existing fountain, waterfall and surrounding concrete flatwork. The restoration will also include concrete repairs, joint repairs, pressure washing, sealing, and restoration of the existing brass fountain nozzles. The scope of improvements for Part 2 includes the renovation of the existing Bayfront Park Fountain. It will be restored to operational status by replacing/ repairing non-functioning equipment and piping. Part 2 Additive Alternate No. 1 replaces the existing lighting system, if the current system is non-repairable. In addition to restoring the fountain operational status, Part 2 Additive Alternate No. 2 includes concrete repairs, joint repairs, pressure washing, and sealing fountain concrete surfaces. Part 2 Additive Alternate No. 3 includes the replacement of broken window glass in the kiosk buildings. Part 2 Additive Alternate No. 4 repairs four (4) wind features. QA Expiration Date has changed from 3/18/2020 5:00:00 PM CST to 4/1/2020 5:00:00 PM CST All work to be performed as outlined in the contract documents, plans and specifications. 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15%.. The work shall be performed at 1901 N. Shoreline Blvd. (Part 1) and 1590 N. Shoreline Blvd. (Part 2) in Corpus Christi, Nueces County, Texas.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents