Similar Projects
Last Updated | 07/25/2023 02:21 PM |
Project Title | Restoration of S.E.A. District Water Features - Part 1 Water Gardens Fountain |
Physical Address | View project details and contacts |
City, State (County) | Corp Christi, TX 78401 (Nueces County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2021 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $320,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of July 31, 2020, there were no bids and it will be rebid in the future. For Water Gardens Fountain The scope of improvements for Part 1, the existing Water Gardens Fountain, the existing underground vault will be abandoned-in-place; the equipment will be removed; and, the vault backfilled with sand. A new above-ground pump house will be constructed at the northwest corner of the Selena Auditorium. The new pump house will contain new pumps and water quality equipment and new electrical systems and controls. The new pump house will connect to the existing fountain display and recirculation piping on the east side of the fountain. And, the existing fountain lighting will be replaced with LED lights. Part 1 Additive Alternate No. 1 includes the restoration of the surface of the existing fountain, waterfall and surrounding concrete flatwork. The restoration will also include concrete repairs, joint repairs, pressure washing, sealing, and restoration of the existing brass fountain nozzles. The scope of improvements for Part 2 includes the renovation of the existing Bayfront Park Fountain. It will be restored to operational status by replacing/ repairing non-functioning equipment and piping. Part 2 Additive Alternate No. 1 replaces the existing lighting system, if the current system is non-repairable. In addition to restoring the fountain operational status, Part 2 Additive Alternate No. 2 includes concrete repairs, joint repairs, pressure washing, and sealing fountain concrete surfaces. Part 2 Additive Alternate No. 3 includes the replacement of broken window glass in the kiosk buildings. Part 2 Additive Alternate No. 4 repairs four (4) wind features. QA Expiration Date has changed from 3/18/2020 5:00:00 PM CST to 4/1/2020 5:00:00 PM CST All work to be performed as outlined in the contract documents, plans and specifications. 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15%.. The work shall be performed at 1901 N. Shoreline Blvd. (Part 1) and 1590 N. Shoreline Blvd. (Part 2) in Corpus Christi, Nueces County, Texas. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |