Similar Projects
Dollar General / Muskegon
New Construction, Infrastructure - 10,640 SF
Design
$3,000,000 CJ est. value
Muskegon, MI 49442

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

Bid Package 7 - North Carr Demolition and Site Renovation
Demolition, Infrastructure
Post-Bid
Muskegon, MI 49442

GLERL Building 1 Renovations
Renovation
Post-Bid
$500,000 CJ est. value
Muskegon, MI 49441

Lead Service Line Replacements
Infrastructure
Results
$1,994,000 CJ est. value
Muskegon, MI 49440

Forest Park Road Reconstruction Phase 3
Infrastructure
Results
$1,968,428 CJ est. value
Norton Shores, MI 49441

Muskegon Museum of Art Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$11,200,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Hotel / Muskegon
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Muskegon, MI 49441

2023 Sand Relocation Projects Muskegon State Park
Infrastructure
Bidding
$350,000 CJ est. value
North Muskegon, MI 49445

Horton Park Improvements Phase II
Infrastructure
Post-Bid
$200,000 CJ est. value
Muskegon, MI 49445

Water System Improvements - McConnell Road
Infrastructure
Results
$532,570 CJ est. value
North Muskegon, MI 49445

New Agricultural Barn - 2022 Bond - Montague Area Public Schools
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montague, MI 49437

Site Paving Project
Infrastructure
Bidding
$800,000 CJ est. value
Muskegon, MI 49442

Last Updated 03/20/2023 11:38 AM
Project Title

Northern Biomedical Research Facility

Physical Address View project details and contacts
City, State (County) Muskegon Hts, MI 49444   (Muskegon County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 125,000 square foot laboratory. As of March 20, 2023, Construction will be starting soon, and end date is estimated for 2024. General contractor has been selected for this project. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents