Similar Projects
2022 Taxiway Microsurface Project
Infrastructure
Design
$500,000 CJ est. value
Valparaiso, IN 46383

SR 2 - Bridge Deck Overlay
Infrastructure
Design
$654,280 est. value
Hebron, IN

Replace Superstructure and New Bridge Construction
Demolition, New Construction, Infrastructure
Bidding
$34,957,000 CJ est. value
Portage, IN 46368

Porter County Roadway Project
Infrastructure
Bidding
$2,396,423 CJ est. value
Valparaiso, IN 46383

Valparaiso City Utilities WWTF Ferrous Chloride Storage Improvements
Renovation
Post-Bid
Valparaiso, IN

Boone Grove High School - New Wastewater Treatment Plant
New Construction
Post-Bid
$650,000 est. value
Valparaiso, IN 46385

Union Center Elementary School Additions & Renovations - 2022
Addition, Demolition, Renovation, Infrastructure
Results
$5,156,852 CJ est. value
Valparaiso, IN 46385

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Burke's Outdoor World
New Construction, Infrastructure - 21,125 SF
Construction
$5,600,000 CJ est. value
Valparaiso, IN 46385

Kossis Building
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Valparaiso, IN 46383

Urschel Laboratories Expansion
Addition, Demolition, Infrastructure - 115,000 SF
Pending Verification
$33,000,000 CJ est. value
Chesterton, IN 46304

Intersect. Improv. W/ Added Turn Lanes
Infrastructure
Design
$7,296,393 CJ est. value
Valparaiso, IN 46383

Small Structure, New
Infrastructure
Bidding
$3,219,126 CJ est. value
Valparaiso, IN 46385

Town of Chesterton - New Pickleball Courts
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Chesterton, IN 46304

Porter Lakes Elementary School Site Improvements
Results
Hebron, IN 46341

Last Updated 09/16/2022 10:05 AM
Project Title

New Salt Barn and Storage Building at: Support Services Center

Physical Address View project details and contacts
City, State (County) Chesterton, IN 46304   (Porter County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,087,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 15, 2022, the project is not award. Anticipated Award of Contract date: August 8, 2022.Anticipated Start of Construction: August 9, 2022.Anticipated Substantial Completion date: December 1, 2022. Lump sum bid proposals will be received for this project at the scheduled time. Bids received after this time shall be returned unopened. Bid security in the form of a bid bond or certified check in an amount equal to 10 percent of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Duneland School Corporation. he Board of School Trustees of the Duneland School Corporation reserves the right to reject any or all bids or parts thereof, or to waive any irregularities or informalities, and to make the award in the best interest of the Duneland School Corporation. No bid shall be withdrawn for a period of sixty (60) days after the scheduled bid opening date. Bidding documents are on file and may be obtained upon receipt of deposit in the amount of $100 for 1 set of the bidding documents consisting of 2 sets of plans, 2 Project Manuals, 1 Compact Disc containing PDF files of drawings and project manual, and 1 set of bid forms from: Gill Reprographics, Inc. (GRI), 17W715 Butterfield Road, Suite B, Oak Brook Terrace, IL 60181, (630) 652-0800, All bidders must comply with all Board of School Trustees local policies as outlined in the bidding documents.The Architect for the above referenced project is Tria Architecture, Inc., (630) 455-4500

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents