Similar Projects
500,000 Gallon Water Tower
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Seward, NE 68434

Concrete Pavement and Storm Sewer Repairs 2023 - Various Locations
Infrastructure
Bidding
$600,000 CJ est. value
Grand Island, NE 68801

Nebraska Center for the Education of Children Who are Blind or Visually Impaired (NCECBVI) Plumbing Improvements Project
Renovation
Sub-Bidding
$415,000 CJ est. value
Nebraska City, NE 68410

Bessey Nursery Irrigation Boom and Supplies
Alteration
Post-Bid
Halsey, NE 69142

Mechanical Hydronic Pipe Fitter and Plumber Labor Contract
Term Contract
Post-Bid
Lincoln, NE

156th Street Improvements, South of Bennington Road Grading, Paving, and Storm Sewer Construction Rebid
Infrastructure
Results
$623,156 CJ est. value
Bennington, NE 68007

Pedersen Basement Rim Joist and Pipe Insulation - 2022
Renovation
Results
$99,950 CJ est. value
Lincoln, NE 68508

2023 Wastewater Treatment Aeration Repairs
Infrastructure
Bidding
$75,000 CJ est. value
Coleridge, NE 68727

Plumbing Services
Alteration
Post-Bid
Omaha, NE

Sanitary Sewer Rehabilitation
Infrastructure
Results
$689,558 CJ est. value
Grand Island, NE 68801

Southern Sarpy County Regional Wastewater System - Phase 1A
New Construction, Infrastructure
Post-Bid
$12,000,000 CJ est. value
Springfield, NE 68059

Water Main Installation, Section 1
Infrastructure
Results
$482,719 CJ est. value
Omaha, NE 68102

SID 341 North Shore 2, Paving, Section 1
Infrastructure
Post-Bid
$440,000 CJ est. value
Papillion, NE 68046

Oak Leaf Storm Sewer Phase 1
Infrastructure
Results
$2,688,328 CJ est. value
Papillion, NE 68046

CIPP Point Liner Kits - Pipe Repair
Alteration
Post-Bid
Lincoln, NE

Last Updated 02/10/2023 03:25 PM
Project Title

Sand Draw Creek - Net Phases 3 and 4

Physical Address View project details and contacts
City, State (County) Valentine, NE 69201   (Cherry County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,051,311 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Total Phase 3 and 4 Existing Timeframe - Husker Grading - $ 1,610,449 Total Phase 3 and 4 Combined Using Atteberry Quarry as Rock Source - Husker Grading - 1440862 The project consists of construction of two separate rock ramp structures within Sand Draw Creek to provide grade stabilization benefits by catching impending headcuts. The structures include placement of rock riprap at varying thicknesses along the channel bed, streambanks, and top of channel banks. Work also includes excavation for placement for: SAND DRAW CREEK - NET PHASES 3 AND 4 BROWN COUNTY, NEBRASKA The project consists of construction of two separate rock ramp structures within Sand Draw Creek to provide grade stabilization benefits by catching impending headcuts. The structures include placement of rock riprap at varying thicknesses along the channel bed, streambanks, and top of channel banks. Work also includes excavation for placement SAND DRAW CREEK - NET of riprap and grading back of channel banks. channel banks. The project site is located in The project site is located in Brown County, Nebraska.A pre-Brown County, Nebraska. Envelopes containing the bids shall be sealed and must be accompanied by a certified check or bidders bond in an amount of not less than five percent of the amount bid. The check or bond shall be made payable to the Treasurer, Middle Niobrara Natural Resources District as security that the bidder to whom the award is made will enter into a contract to complete the rehab project and furnish the required bonds. Bids will be publicly opened and read at the District's office at that time and place. No bid shall be withdrawn after opening bids without consent of the Middle Niobrara Natural Resources District for a period of 45 days after the scheduled time for closing bids. The District reserves the right to reject any or all bids and to waive any informalities in the bidding. All bidders are encouraged to request plans electronically from Ryan Roenigk to be placed on the plan holders list and ensure that all addendums, notifications, etc. are received prior to the bid date.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents