Similar Projects
Upgrade Mechanical Systems
Bidding
Less than $250,000 est. value
River Grove, IL 60171

HVAC Replacement Contract No. 1
Bidding
Less than $2,200,000 est. value
Fairfield, Mount Carmel, Olney, Robinson, IL 62837

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

Administration Center Chiller Replacement
Bidding
Algonquin, IL 60102

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

Hot Water Heater Replacement
Results
Rock Island, IL 61201

Chiller
Bidding
Aledo, IL 61231

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Galesburg AC Replacement
Bidding
Galesburg, IL

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

2020 Community Center HVAC Replacement
Results
Lake Zurich, IL 60047

Last Updated 12/29/2020 08:34 AM
Project Title

New Furnace for Lincoln Trail State Park Showerhouse

Physical Address View project details and contacts
City, State (County) Marshall, IL 62441   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Lincoln Trail State Park, Marshall, Illinois Remove existing Reznor Furnace – Model XE300-8-s-MV-E (Serial # EBBE65U9L08746MV4) from existing ductwork. Remove existing temperature controls and any other unusable components from the site and discard per applicable EPA regulations. Provide two (2) new occupancy sensors in the restroom areas (one in men’s and one in women’s side). Connect new motion sensors to existing exhaust fan. Install new second stage pressure regulator (11 inches w. c.) on exterior wall near existing propane tank. Locate above snow/ leaf line. Connect new regulator to existing gas line. Connect new horizontal LP gas furnace with stainless steel heat exchanger to existing ductwork in the shower building mechanical room. New unit to be minimum 250,000 BTU input and include new simple programmable digital thermostat and new adjustable humidistat (to be located on interior wall in men’s restroom at least 60 inches AFF). The new thermostat and the new humidistat are to have a vandal resistant locking cover. The new furnace blower is to supply approximately 2500 CFM. All new equipment is to be accessible through an access panel in the ductwork for maintenance. Some minimal ductwork modifications may be needed. New ductwork is to have one inch rigid exterior insulation. Supply new motorized make-up air louver, grill, and insect screen on exterior wall in existing mechanical room. This louver is to allow additional make-up air for building pressure, when occupancy sensors trip on the building exhaust fan. Connect new louver to existing exhaust fan. Tie in all electrical, controls, flue, ductwork, and insulation, per applicable codes. Start up, and test new system to ensure complete system is working as designed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents