Similar Projects
Geothermal (Ground Source) Heat Pump Systems
Alteration
Bidding
Towson, MD

Victory Villa Senior Center HVAC Replacement
Alteration
Bidding
$100,001 to $500,000 est. value
Middle River, MD 21220

Eastern Technical High School Air Conditioning Project
Post-Bid
Essex, MD 21221

Install and Repair Heat Pump and Air Handler
Post-Bid
$250,000 to $500,000 est. value
Middle River, MD 21220

Dust Collector Rental
Results
Baltimore, MD 21226

HVAC System Renovation at Booker T. Washington Middle School #130
Results
Baltimore, MD 21217

Replace Air Conditioning Units
Post-Bid
Baltimore, MD 21207

HVAC System Modification at Harlem Park Building #78
Results
Baltimore, MD 21217

Switchboard and Generator Upgrade
Post-Bid
Windsor Mill, MD 21244

Bedford Elementary School Installation of Air Conditioning
Results
$1,000,000 to $2,500,000 est. value
Baltimore, MD 21208

Chiller Maintenance, Baltimore County Facilities, Term Contract
Term Contract
Post-Bid
MD

Replace 30 Ton Rooftop Chiller in Owings Mills
Results
Owings Mills, MD 21117

Industrial Overhead Fan Maintenance
Post-Bid
Middle River, MD

Lansdowne High School Installation of Air Conditioning
Results
$5,000,000 to $10,000,000 est. value
Lansdowne, MD 21227

HVAC Maintenance
Term Contract
Post-Bid
Baltimore, MD

Last Updated 08/03/2021 01:20 PM
Project Title

General Services HVAC Replacement

Physical Address View project details and contacts
City, State (County) Towson, MD 21204   (Baltimore County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace and upgrade the existing HVAC system in the General Services building.

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Firestopping, Penetration Firestopping.
Division 08 - Openings, Metal Doors and Frames, Hollow Metal Doors and Frames.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Hydronic Piping and Pumps, Refrigerant Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Ducts, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Refrigerant Condensers, Central HVAC Equipment, Packaged Outdoor HVAC Equipment, Dedicated Outdoor-Air Units, Decentralized Unitary HVAC Equipment, Variable Refrigerant Flow HVAC Systems, Convection Heating and Cooling Units, Unit Heaters.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Enclosed Switches, Low-Voltage Controllers, Enclosed Controllers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents