Similar Projects
Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Compark South Filing 1 Concrete Flatwork
Post-Bid
Greenwood Village, CO 80111

2020 CIP- Concrete Replacement Project
Results
Greenwood Village, CO 80112

Orchard Road Trail
Results
$350,000 to $400,000 est. value
Centennial, CO 80112

2020 Concrete Utility Project
Post-Bid
Englewood, CO

2020 Miscellaneous Concrete Project
Results
Less than $1,024,494 est. value
Littleton, CO 80120

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Chenango Park Trail Reconstruction
Infrastructure
Post-Bid
Greenwood Village, CO

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Last Updated 07/01/2021 11:41 AM
Project Title

Concrete Utility Project

Physical Address View project details and contacts
City, State (County) Englewood, CO   (Arapahoe County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes removal and replace damaged or deteriorated concrete curb and gutter, sidewalk, curb ramps, cross pans, concrete pads and related work, at location to be provided by the City of Englewood. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with the Contract Documents. Work will primarily take place in Zone 3 but may include other locations within the city designated by the City of Englewood construction manager throughout the project.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents