Similar Projects
Construct BCE Complex
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Springfield, IL 62703

State Armory Building - Renovate the State Armory - Stabilization
Term Contract, LEED Certification, Renovation, Infrastructure - 254,636 SF
Bidding
$17,000,000 CJ est. value
Springfield, IL 62706

Pavement Marking on Various Routes
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Chicago, IL 60652

Meter Replacement (Contract E)
Infrastructure
Sub-Bidding
$404,000 CJ est. value
Riverton, IL 62561

Papa John's
New Construction - 1,620 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value

Scooter's Coffee
New Construction - 668 SF
Post-Bid
$250,000 est. value
Springfield, IL 62702

JPMC SW Athletic Surfaces With Installation
Renovation
Results
Springfield, IL

Chatham Cafe
Build-Out
Pending Verification
Springfield, IL 62704

KFC Renovations
Renovation
Pending Verification
Springfield, IL 62702

Rehabilitate Runway 4/22 - Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Springfield, IL 62707

Bit. Materials (Seal Coat)
Infrastructure
Sub-Bidding
$58,810 CJ est. value
Divernon, IL 62530

Railway Overpass Power Relocation
Infrastructure
Post-Bid
$500,000 CJ est. value
Springfield, IL 62703

KFC Renovation
Renovation
Pending Verification
Springfield, IL 62702

Overpass Business Park Water Main Extension (Contract A.1)
Infrastructure
Bidding
$404,000 CJ est. value
Riverton, IL 62561

Furnish and Apply Bit. Materials (Seal Coat)
Infrastructure
Post-Bid
$300,000 CJ est. value
Auburn, IL 62615

Last Updated 08/04/2022 09:02 AM
Project Title

Chicken Salad Chick / Springfield

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A new restaurant is being planned. As of July 29, 2022, final planning is in progress. No information regarding a general contractor or the method of selection thereof has been established at this time. No construction timeline has been established at this time.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents