Similar Projects
CD 1.11 - Emergency Generators 1 thru 4 Rehab - South District Waste Water Treatment Plant
Bidding
$3,988,900 est. value
FL

Remove & Replace AK Generator Fuel Tanks at Adams Key
Bidding
Homestead, FL

CD 1.11 - Emergency Generators 1 thru 4 Rehab SDWWTP
Post-Bid
Less than $2,154,000 est. value
Miami, FL 33190

Installation of Solar Photovoltaic Systems
Post-Bid
Miami, FL

Hurricane Irma Related Repairs at the Tri-Rail Station Ceiling Slats and Lighting
Results
Less than $54,545 est. value
Hialeah, FL 33147

Curtiss Mansion Site Improvements - Parking Lot Lighting
Results
Miami Springs, FL 33166

Jackson Dade Head Start Electrical Meter Upgrade
Post-Bid
Less than $11,500 est. value
Miami, FL 33136

Power Plant Generator
Results
Homestead, FL 33030

Eureka Adult Day Training Center
Renovation
Post-Bid
Miami, FL 33157

LED Smart Lighting and Smart County Systems
Results
Less than $176,516,780 est. value
Miami, FL 331281983

EV Charging Stations
Post-Bid
Miami Lakes, FL 33014

Trip Saver II Recloser Pole Top
Results
Homestead, FL 33030

6140--Battery Bank Replacement
Post-Bid
Miami, FL 33125

Purchase of Light Poles, Fixtures, and Bases
Term Contract
Results
Miami Beach, FL 33139

UPS Battery Maintenance
Post-Bid
Miami, FL 33136

Last Updated 01/07/2020 02:37 PM
Project Title

Electrical Improvements - Substations 7A, 8A, 9A, 10A

Physical Address View project details and contacts
City, State (County) Key Biscayne, FL 33149   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,194,154
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is notlimited to, furnishing all materials, labor, and equipment necessary for new electrical substation building for Substations 7A, 8A, 9A and 10A. The substations provide power for the processes at the Oxygen Generation Plant 2 Building. The electrical improvements consist of removing the existing substation transformers within the existing building and installing new transformers and electrical gear within a new Substation Building. Demolition will include the removal and disposal of the existing substation transformers and equipment associated with existing substations 7A, 8A, 9A, 10A and the existing motor starter cubicle for Compressor No. 3. In addition, the existing 1,500 HP motor will be removed and turned over to the owner and replaced with a larger owner furnished motor. General site civil work will include all grading, paving, drainage, utilities and pavement restoration. A driveway will be provided along with two on-site parking spaces. Utilities to be provided includes a water service line to be provided to the new building for cooling tower operation. The walls of the new building will consist of concrete masonry unit blocks with concrete cast-in-place columns supporting the roof loads. The roof will consist of pre-cast concrete joists connected to the concrete columns. The roofing will consist of SBS modified bituminous membrane. The columns and floor slabs will carry the loads to grade beams and pile caps, which then transmit the loads to auger cast-in-place (ACIP) concrete piles, which form part of the building`s foundation system. The new building will be designed to comply with sea level rise and storm surge design criteria for the CDWWTP which require all critical facilities to be placed at or above a finished floor elevation(FFE) of 20.9 NGVD. The Small Business Enterprise - Construction goal is 13.01% and the Small Business Enterprise - Goods goal is 3.02% which is based on the construction estimate plus the 10% Contingency Allowance.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents