Similar Projects
2021 Bond Passed - East Mills School District
Addition, Demolition, New Construction, Infrastructure, Renovation
Design
$22,000,000 CJ est. value
Malvern, IA 51551

2021 Bond Passed - East Mills School District
Addition, Demolition, New Construction, Infrastructure, Renovation
Design
$22,000,000 CJ est. value
Malvern, IA 51551

RFP Engineering - GRC 212-214 and 717 Main Road Tunnel Repairs and Powerhouse Parking Lot
Infrastructure
Post-Bid
$300,000 CJ est. value
Glenwood, IA 51534

RFP Engineering - GRC 212-214 and 717 Main Road Tunnel Repairs and Powerhouse Parking Lot
Infrastructure
Post-Bid
$300,000 CJ est. value
Glenwood, IA 51534

HMA Resurfacing with Milling
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Water / Sewer - City of Henderson
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Henderson, IA 51541

East Mills Community High School Addition & Renovation - Rebid
Addition, Renovation, Infrastructure - 50,000 SF
Post-Bid
$19,400,000 CJ est. value
Malvern, IA 51551

HMA Crack Filling - U.S. 34
Infrastructure
Results
IA

Jesup Avenue Reconstruction - 2019 Flood Recovery
Infrastructure
Post-Bid
$300,000 CJ est. value
Pacific Junction, IA 51561

Granular Surfacing of Roadway
Infrastructure
Results

2022 Water System Pumping and Storage Improvements
New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Glenwood, IA 51534

Nishnabotna Wildlife Unit Access Road Maintenance
Infrastructure
Results
IA

Glenwood Municipal Utilities Lake Ohana Tower
Infrastructure, Renovation
Post-Bid
$2,000,000 CJ est. value
Glenwood, IA 51534

U.S. 59 - HMA Resurfacing/Cold in-Place Recycling
Infrastructure
Results
IA

Last Updated 04/27/2023 06:35 AM
Project Title

HMA Resurfacing With Milling

Physical Address View project details and contacts
City, State (County) Silver City, IA 51571   (Mills County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $6,647,790 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 230321 A1 County : Mills Projects Included: NHSX-059-2(021)--3H-65 Route: U.S. 59 Fremont Co Line to US 34 Working Days : 90 Estimated Value : $5,000,000 - $7,500,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 167 HMA Resurfacing With Milling *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DBE (2%)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents