Similar Projects
Scrap Metal Recycling
Infrastructure
Bidding
Reading, PA

Tuscarora State Forest Timber Stumpage Sale
Term Contract
Bidding

Scrap Metal Recycling Services
Post-Bid
Reading, PA 19601

Trash Removal Services
Post-Bid
Reading, PA 19601

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Weidner Road Culvert
Results
Boyertown, PA 19512

Residential Solid Waste and Recycling Collection, Transportation, and Disposal
Term Contract
Bidding
Elverson, PA

Collection, Transportation and Processing of Municipal Solid Waste and Recyclable Materials
Term Contract
Post-Bid
Reading, PA

Vale Drive Stream Restoration Project
Results
Boyertown, PA 19512

2020 Brush/Yard Waste Pickup Spring
Post-Bid
Mohnton, PA 19540

Site Utilities and Aviation Road Construction - Phase 1
Results
$6,000,000 est. value
Reading, PA 19601

Timber Sales State Game Lands No 052
Post-Bid
PA

23WHM -SGL 110 Tilden Access Road Maintenance
Results
$118,000 est. value
PA

RACC Snow Removal Service 2020-2021
Term Contract
Post-Bid
Reading, PA 19602

Refuse And Recycling Services Reading, Pa (Pa086)
Results
Reading, PA 19607

Last Updated 09/07/2021 04:48 PM
Project Title

Reed Bed Refurbishment

Physical Address View project details and contacts
City, State (County) Sinking Spring, PA 19608   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,000 to $300,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project is concentrated around Reed Beds No. 7 through 12 at the wastewater treatment plant. The project generally consists of the removal of the sludge, filter media, and 6" of stone and legally disposing of this material at an off-site location. Reconstruct the beds with 6" of stone, 4" of pea gravel, and 6" of sand, as specified, to the elevations shown on the reference drawing. As an Alternate Bid item, provide and install 6" of glass beads in lieu of the top layer of sand. After the installation has been approved by the Owner and engineer, plant new reeds in the refurbished beds.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents