Similar Projects
On Call Drilling and Well Installation Services for City Landfills
Term Contract
Bidding
Sacramento, CA 95811

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Bidding
Sacramento, CA

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Hatchery Pump Maintenance and Repair
Term Contract
Bidding
$40,000 est. value
CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Construction Management and Inspection Services for Olcese 3 Well Building Construction
Term Contract, Alteration
Bidding
Bakersfield, CA

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Results
Anaheim, CA

Mojave Drive and Bellflower Street Dry Well Project
Infrastructure
Bidding
$30,000 est. value

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Reported 02/05/2022 12:00 AM
Project Title

SLAC 1801 Pumps Installation

Physical Address View project details and contacts
City, State (County) West Menlo Park, CA 94025   (San Mateo County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of six (6) replacement water pumps at the 1801 Facility. The replacement pumps are Owner Furnished; a separate contract is in place for the delivery of the pumps to the SLAC Facility. The existing pumps are working beyond their service life and demand intensive maintenance. Their reliability is not adequate to keep on continuous service. The replacement work will be performed one-by-one as to keep 4 pumps online while keeping one pump as back up. All existing pumps are fitted with isolation valves so that the replacement work will not require downtime and can be performed independent of each other.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents