Similar Projects
I-84: Hilgard - Ontario
Infrastructure
Design
$2,231,250 CJ est. value
La Grande, OR 97850

I-84: Bridges over OR 237 (North Powder Interchange)
Infrastructure
Design
$3,138,000 CJ est. value
La Grande, OR 97850

2023 SCA Road Project
Infrastructure
Bidding
$200,000 CJ est. value
Elgin, OR 97827

RFP D/B - Multi-Use Academic and Athletic Center
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
La Grande, OR 97850

North Powder Rural Fire Canopy
Addition, Demolition, Infrastructure
Post-Bid
$27,900 CJ est. value
North Powder, OR 97867

Wastewater System Improvements 2023 Rebid
Infrastructure
Results
$2,248,888 CJ est. value
North Powder, OR 97867

Wastewater System Improvements 2023 Rebid
Infrastructure
Results
$2,248,888 CJ est. value
North Powder, OR 97867

Morgan Lake Road Safety Improvements
Infrastructure
Design
$1,391,193 CJ est. value
La Grande, OR 97850

RFP D/B - Design-Builder for Locker Room Addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Imbler, OR 97841

Water System Backup Power and System Controls Improvements - 2022
New Construction, Infrastructure
Results
$2,511,300 CJ est. value
Union, OR 97883

Woodruff Lane: Catherine Creek Bridge (Union County)
Demolition, New Construction, Infrastructure
Design
$2,046,349 CJ est. value
La Grande, OR 97850

2022/2023 - Sanitary Sewer Rehabilitation Project
Infrastructure
Post-Bid
$400,000 CJ est. value
La Grande, OR 97850

E. Chestnut Street Improvements
Infrastructure
Results
$228,275 CJ est. value
Union, OR 97883

OR 203: Union to Catherine Creek
Infrastructure
Results
$3,189,870 CJ est. value
La Grande, OR 97850

Wastewater Treatment Plant Control System Modernization - 2022
Renovation, Infrastructure
Results
$391,000 CJ est. value
La Grande, OR 97850

Last Updated 02/03/2023 07:08 AM
Project Title

Headworks Screen Improvements - 2022

Physical Address View project details and contacts
City, State (County) Union, OR 97883   (Union County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $397,670 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Water/Wastewater Infrastructure, Water and Wastewater Facilities The Work for this Contract involves the construction of a new headworks at the Owner's wastewater treatment facility, including a new headworks channel; rerouting and extending the 14-inch influent sewer pipe; installation of the new headworks screen provided by the Owner; and completion of miscellaneous electrical, control, and utility improvements; together with all other Work required to complete the Project as shown on the Drawings and specified. Bid Options for this Project include connecting the existing 8-inch gravity sewer pipe directly to the new headworks channel or rerouting the existing 8-inch sewer pipe as shown on the Drawings and providing and installing a weather-proofing package on the headworks screen or constructing a building over the new headworks channel. One Additive Alternative to the Project includes insulating the building over the new headworks channel, should that Bid Option be selected. The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law. This Project is being funded by the City of Union, Oregon. Est. Value Notes: $270,000 to $370,000 Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner is an equal opportunity employer. Minority and women-owned businesses are encouraged to bid. Minority and women-owned businesses should indicate they are a minority on the Planholders List *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work will be substantially completed within 220 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 250 days after the date when the Contract Times commence to run

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents