Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Springdale Municipal Complex Renovations
Renovation
Bidding
West Columbia, SC 29170

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Peanut Inspections Training Building
New Construction
Post-Bid
$250,000 to $300,000 est. value
West Columbia, SC

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Building Pad In The Project Icehouse Redevelopment
Construction
Lexington, SC 29072

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

South Atlantic Regional Construction IDIQ
Results
$50,000 to $80,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Lexington - Enclosure of Existing Pole Building
Post-Bid
$40,000 to $70,000 est. value
West Columbia, SC 29169

Cayce Utility Department Building
Results
$100,000 est. value
Cayce, SC 29033

Last Updated 10/06/2020 11:06 AM
Project Title

Bathroom Modification

Physical Address View project details and contacts
City, State (County) Leesville, SC 29240   (Lexington County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $20,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing bathroom Install new roll-in shower, provide/install new ada toilet, provide/install new ada sink, widen doorway and other finish work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents