Similar Projects
Last Updated | 07/19/2023 12:22 PM |
Project Title | Additions and Alterations to the Steel Center CTE |
Physical Address | View project details and contacts |
City, State (County) | Jefferson Hills, PA 15025 (Allegheny County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Site Development, Vocational School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | It is the intent of the Owner to enter into separate contracts as follows: Contract No. 1 General Construction. Contract No. 2 HVAC Construction. Contract No. 3 Plumbing Construction. Contract No. 4 Electrical Construction. Each bid must be accompanied by a Bid Bond, Cashier's Check, Trust Company Treasurer's Check or Certified Check made payable to the Steel Center for CTE in an amount of not less than five percent (5%)of the proposal (including Base Bid and all Add Alternate Bids). B. Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bond or Check of all Bidders whose Bids are not accepted will be returned within ten calendar days after the scheduled bid opening date. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |