Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

New High School - Chicago Public Schools
New Construction
Conception
$120,000,000,000 est. value
Chicago, IL

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

2021 Renovations at Winnetka and Northfield Campus Bid Period 1
Renovation
Results
Northfield, Winnetka, IL 60093

ROF at Davis Elementary School and Madero Middle School
Results
Chicago, IL 60632

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Roofing Replacement And Roof Coating
Renovation
Results
Calumet City, Lansing, IL 60438

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

Remedial Masonry Repair At Maine West HS
Renovation
Results
Des Plaines, IL 60018

2021 Building Renovations At Multiple Sites
Renovation
Post-Bid
Berwyn, IL

Door & Frame Replacement Vaughn HS
Addition
Results
Chicago, IL 60641

Asbestos Abatement New Trier High School - Winnetka Campus, 3Rd Floor Renovation Spaces
Renovation
Post-Bid
Winnetka, IL 60093

Last Updated 06/23/2022 07:08 AM
Project Title

2021 Improvements at Fierke and Kruse Education Centers

Physical Address View project details and contacts
City, State (County) Oak Forest, Orland Park, IL 60452   (Cook County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work at both school locations includes, but is not limited to, new floor finishes, new metal lockers and a new reception desk and casework at the reception area front office. A supported ridge pyramid skylight will also be added to the Media Center. Refer to Construction Documents for extent of Work scope

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents